← Back to Anaheim, CA

Document Anaheim_doc_9f2522dfb0

Full Text

WQMP CHECKLIST Page 1 The purpose of this checklist is to allow project proponents an opportunity to review their WQMP prior to submittal to ensure all items in this checklist are addressed. Additionally, it provides a uniform format for comprehensive and complete reviews of The completed checklist will be transmitted to the project applicant with the project WQMP. A copy of the completed checklist will be retained with the project case file. This checklist shall be utilized in conjunction with the City of Anaheim WQMP Template, City of Anaheim BMP Design Guidelines, and City of Anaheim Sizing Worksheets, available at the City of Anaheim website. The requirements of these resources were developed by following the County of Orange Model WQMP Template and the 2013 Technical Guidance Document with additional guidance that pertain to City of Anaheim Priority Development Projects. For any requirements not satisfied Marked additional explanations are provided where applicable (comments provided in red italics). Line items with the icon are only required for Final and to be provided if available for the Preliminary WQMP. Line items with the icon denotes additional guidance is available to the plan reviewer. WQMP Project Check Project Information WQMP: Preliminary Final City Project Number Project Name Project Address Name/Number of Plan Checker Name/Number of Plan Check Supervisor First Review WQMP Received On: Review Completed On: Second Review WQMP Received On: Review Completed On: Third Review WQMP Received On: Review Completed On: WATER QUALITY MANAGEMENT PLAN (WQMP) REVIEW CHECKLIST JANUARY 2024 Checklist to be utilized on initially submitted during the 2024 calendar year ---PAGE BREAK--- WQMP CHECKLIST Page 2 Title, Owner’s Certification and Table of Contents WQMP REQUIREMENT Requirement Satisfied? Yes No N/A If applicable, has the Preliminary WQMP and any comments on the Preliminary WQMP deferred to the Final WQMP been reviewed to ensure consistency with Final WQMP? Is this WQMP affected by a Master WQMP or similar Document that would affect the design or implementation of the BMPs and, if so, has it been provided and reviewed for consistency? Is there an existing WQMP for the Property Or underlying the proposed footprint of the project? If yes, does this WQMP properly reference this prior WQMP and take the existing WQMP into account/consideration for the proposed project/WQMP? Title Page Name of project Application WQMP number) and/or Tract Number Owner/Developer name, address, phone and email address Site address (or addresses) and planning area number Lot number(s) if site is a portion of a Tract Consulting/Engineering (WQMP preparer) firm name, address, phone and email address Date WQMP was prepared/revised Applicable Jurisdictional Information Shown Owner’s Certification Is the Owner certification statement, in which the project owner acknowledges and accepts the provisions of the WQMP signed? Is the certification by the Engineer indicating their assurance that the WQMP complies with the permit requirements signed? Table of Contents Is a Table of Contents provided, including a list of all figures and attachments? Comments – Title, Owner’s Certification and Table of Contents ---PAGE BREAK--- WQMP CHECKLIST Page 3 Section 1 – Permit(s) & Water Quality Conditions of Approval or Issuance WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 1.1 Are the Water Quality Conditions of Approval or Issuance relevant to WQMP preparation listed, if any (see Section 2.1 of the TGD for reference)? 1.2 Is the address and/or the lot & tract/parcel map number describing the subject property provided? 1.3 Are applicable conditions from watershed-based plans, such as WIHMPs and provided? (Currently Not Applicable) 1.4 If applicable, has the prior approved Preliminary WQMP been reviewed to confirm consistency of the Final WQMP? If there are any substantive differences, are they adequately explained? Comments – Section 1 Section 2 – Stormwater Credit Program WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 2.1 Has the table correctly identified if the project is purchasing Stormwater Credits per the Stormwater Credit Program? 2.2 Has the approved Stormwater Credit Application (with attachments, stamped by the City that funds for Credit purchase were received by the City) included in Attachment H of this WQMP? Comments – Section 2 ---PAGE BREAK--- WQMP CHECKLIST Page 4 Section 3 – Project Description WQMP REQUIREMENT Requirement Satisfied? Yes No N/A III.1: Project Description 3.1 Does the project accurately identify its priority project development category(s) (see Table 7.II-2 of Model WQMP for reference)? 3.2 Is sufficient detail provided about the proposed development that is not, otherwise, available on the plans and exhibits in Section 6? 3.3 Are pre- and post-project condition impervious percentages, drainage patterns, and storm drain connections provided to understand the project’s drainage conditions and hydrology? For Commercial and Industrial Projects: 3.4 Is the Standard Industrial Classification (SIC) Code(s) which best describes the facilities operations provided? 3.5 Describes, if any, food preparation, cooking, and eating areas (specify location and type of area), delivery areas and loading docks, outdoor material storage areas, vehicle maintenance areas, and other activities that will be completed outdoors? For Residential Projects: 3.6 Range of lot and home sizes provided, and all community facilities such as laundry, car wash, swimming pools, jacuzzi, parks, open spaces, tot lots, etc., if any? III.2: Potential Stormwater Pollutants 3.7 Does the project identify the potential stormwater or urban runoff pollutants reasonably expected to be associated with the project (see Table 2.1 of the TGD for reference)? III.3: Hydrologic Conditions of Concern 3.8 Are Hydrologic Conditions of Concern (HCOC) identified (see TGD Appendix XVI for reference)? 3.9 If the project is determined to be in an HCOC susceptible area, are supporting 2-year pre- and post-development runoff volume, Tc, and flow rate calculations provided? 3.10 Does the project adequately demonstrate that it is exempt or requires hydromodification (post-development does or does not exceed 5% pre-development)? III.4: Post Development Drainage Characteristics 3.11 Is post-development drainage characteristics adequately described, including how runoff drains from the project site to receiving waters? III.5: Property Ownership/Management 3.12 Describes ownership of all portions of project and site: • If applicable, is all infrastructure proposed to be transferred to public agencies (City, County, Caltrans, etc.) properly identified? ---PAGE BREAK--- WQMP CHECKLIST Page 5 WQMP REQUIREMENT Requirement Satisfied? Yes No N/A • If applicable, is a homeowners or property owners association to be formed properly identified? Comments – Section 3 Section 4 – Site Description WQMP REQUIREMENT Requirement Satisfied? Yes No N/A IV.1: Physical Setting 4.1 Identifies project location, community name, and site size to nearest tenth acre? 4.2 Is the zoning and land use designation identified? 4.3 Is Hydrologic Soil Group(s) A, B, C, or D for the site correctly identified? IV.2: Site Characteristics 4.4 Is the Precipitation Zone (see TGD Appendix XVI or the website link above for reference) for the project site correctly identified? 4.5 Does the project identify all details related to soil type/geologic conditions based on best available information? 4.6 If present, is off-site run-on identified and does the project describe how it will be managed? If there are co-mingled flows, are they adequately treated by LID BMPs? IV.3: Watershed Description 4.7 Is the watershed in which the project is located identified and the: • receiving waters? • 303(d) Listed Water Quality Impairments? er_quality_assessment/2020_2022_integrated_report.html • Applicable Total Maximum Daily Loads dl/2020_2022state_ir_reports_final/apx-h-2018-303d- list.xlsx • Pollutants of Concern for the Project (See Table 2.1 of the TGD for reference)? ---PAGE BREAK--- WQMP CHECKLIST Page 6 Comments – Section 4 Section 5 – Best Management Practices (BMPs) WQMP REQUIREMENT Requirement Satisfied? Yes No N/A V.1: Project Performance Criteria 5.1 If applicable Watershed Infiltration and Hydromodification Master Plan (WIHMP) is available, does the project incorporate watershed specific criteria? (Currently Not Applicable) 5.2 If Project is susceptible to HCOCs, is Section 7.II-2.4.2.2 of the Model WQMP (North County Requirements) transcribed, verbatim? 5.3 Are the applicable LID performance criteria transcribed, verbatim, from Section 7.II-2.4.3 of the Model WQMP, including specific BMP approaches identified for any specific project features (such as EPA Green Streets)? 5.4 If it is not feasible to meet LID performance criteria, are applicable treatment control BMP performance criteria transcribed, verbatim, from Section 7.II-3.2.2 of the Model WQMP, including calculations based on accepted criteria? 5.5 Is the calculated LID design storm capture volume (DCV) provided, based on Orange County specific criteria? V.2: Site Design and Drainage Plan 5.6 Describes a site design and drainage plan that: • Provides a narrative of site design practices utilized HSCs that are not designed to meet numeric performance criteria); • Provides calculations of Design Capture Volume (DCV) for each DMA; 5.7 If the project includes a parking structure or garage with open sides, is the BMP designed to accommodate runoff from wind driven rain into the parking structure as outlined in Section 8 of the City of Anaheim BMP Design Guidelines? 5.8 If the Project includes a loading dock, is the loading dock drainage routed to a biotreatment BMP where feasible and does the design follow applicable fact sheet design requirements (SD-31, N6, etc.)? 5.9 If the Project Includes improvements within the City’s Right-of- Way (ROW), please answer the questions below or mark N/A: ---PAGE BREAK--- WQMP CHECKLIST Page 7 WQMP REQUIREMENT Requirement Satisfied? Yes No N/A • Are the areas of improvements to the City’s ROW roadway widening, new drive approach, relocated catch basin) adequately described narratively in the report? For Preliminary it is acceptable to describe the ROW improvements and note that an appropriate BMP strategy will be included as part of the Final WQMP. • Is the ROW Significant Redevelopment Footprint Exhibit included in the WQMP and does it accurately identify any changes of purpose, impacts to hydraulic capacity or changes to grade line associated with the ROW improvements? • Are the ROW improvement areas addressed adequately by upsizing on-site BMPs following Section 9 of the City of Anaheim BMP Design Guidelines, or by use of BMPs within the City ROW following Public Works design guidelines, Green Street Standards, and Section 6 of City of Anaheim BMP Design Guidelines? See item 5.5 to ensure O&M will be accepted if applicable. 5.10 Are BMPs designed as off-line systems, where feasible, and are they designed in an elegant and efficient manner? Low flows are routed to the BMP, while high flows bypass the system. If the BMP is designed as an in-line system, is there justification physical impediment) identified that would prevent the BMP to be designed as an off-line system? 5.11 If the BMP is designed as an in-line system, is the bypass/overflow outlet structure properly designed to convey the high flow storm event associated with the project (i.e. 10-, 25-, 50- year) and is the BMP designed to minimize the possibility for the design capture volume to be flushed out and/or cause resuspension of pollutants? V.3: LID BMP Selection and Project Conformance Analysis 5.12 Hydrologic Source Controls (if HSCs are proposed to meet retention criteria): Does the narrative and calculations of proposed HSCs show how they meet retention requirements? Are the results supported with the completion of Worksheet A from the TGD? Infiltration BMPs 5.13 Has the Infiltration Feasibility Worksheet (Table 2.7 from TGD) been completed and included? 5.14 Has the Summary of Groundwater-related Feasibility Criteria (Worksheet I from TGD) been completed and included? 5.15 If Infiltration is feasible, is the selection of BMP type (INF) described, and do sizing calculations show adequate capacity and drawdown? ---PAGE BREAK--- WQMP CHECKLIST Page 8 WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 5.16 Are BMPs properly designed to retain the DCV in an elegant and efficient manner overflow drains are at correct heights, pervious pavement is not on a slope or is considered in volumetric calculation, planting soil is specified in detail if volume is claimed for engineered media)? Design standards can be found in the City of Anaheim BMP Design Guidelines. All BMP sizing shall follow the City of Anaheim modified TGD sizing worksheets, available for download from the City website. 5.17 Is adequate pretreatment provided relative to land use and anticipated pollutants, soil conditions and type of infiltration BMP? If focused infiltration is proposed, utilize Section 7.2 of the City of Anaheim BMP Design Guidelines to determine if requirements are being met. In all scenarios, PRE-2 (catch basin inserts) and pretreatment BMPs that feature standing water are not allowed for pretreatment of infiltration BMPs. 5.18 Class V Injection Well (any subsurface infiltration; i.e. drywells, infiltration galleries, trenches): If the infiltration facility qualifies as a Class V Injection Well (see link: http://water.epa.gov/type/groundwater/uic/class5/types_storm water.cfm) has it been submitted to the EPA database for registration and registration included as an attachment to the WQMP? (see link: registration) Evapotranspiration, Rainwater Harvesting BMPs (ONLY required if entire DCV not met through above BMPs) 5.19 Has TGD Feasibility Worksheet J and supporting calculations been completed? 5.20 Has the selection, suitability and sizing information, with applicable calculations, of Harvest-and-Reuse (HU) BMPs been provided? 5.21 If Evapotranspiration/Harvesting BMPs are infeasible to treat the LID DCV, has documentation been provided as to how much DCV can be met and why it is not feasible to meet the full volume with evapotranspiration/ harvest BMPs, infiltration BMPs, or a combination of them? Credits Purchased in Lieu of Biotreatment BMP 5.22 Has the credit summary table been properly completed? 5.23 Has the correct land use and associated Pollutant Load Multiplier (PLM) been selected correctly for the DMAs utilizing credits? Biotreatment BMPs (ONLY required if entire DCV not met through above BMPs) 5.24 Has the selection, suitability and sizing information, with applicable calculations, of Biotreatment (BIO) BMPs been provided? ---PAGE BREAK--- WQMP CHECKLIST Page 9 WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 5.25 Are the Biotreatment BMPs designed in an elegant and efficient manner to prevent clogging of inflow/outflow pipes? Additional design standards are provided in the City of Anaheim BMP Design Guidelines Sections 3, 4, and 5. Hydromodification Control BMPs (if required) 5.26 Has the selection, suitability and sizing information, with applicable calculations, of Hydromodification Control BMPs been provided? Treatment Control 5.27 Regional/Sub-Regional LID BMPs (if available and DCV not met through above BMPs): Are regional/sub-regional LID BMPs in which the project will participate in adequately described? 5.28 Treatment Control BMPs Has the selection, suitability, and sizing information, with applicable calculations, of Treatment BMPs? Trash Provisions 5.29 As described in Section 10 of the City of Anaheim BMP Design Guidelines, does the project ultimately discharge to a public catch basin equipped with a full capture system (FCS) either by surface runoff or by routing the storm drain through a public catch basin (these two conditions are the City’s preferred discharge method)? 5.30 If the project impacts an off-site catch basin within the City’s Right of Way, does design include the implementation of “full capture systems” within the catch basin(s) that are designed to treat the 1-year, 1-hour storm event for the entire tributary area of the catch basin? 5.31 If the project has a direct connection to the City’s storm drain due to a physical impediment that has been demonstrated to the satisfaction of the City’s case engineer, is the physical impediment described in detail in the WQMP? 5.32 If the project has a direct connection to the City’s storm drain, does the project achieve full trash capture equivalency as described in Section 10 of the City of Anaheim BMP Design Guidelines? Source Control and Other BMP Details 5.33 Non-Structural Source Control BMPs: Does the project properly prescribe non-structural source control BMPs and include valid explanations for those that are not used? Are implementation responsibilities identified and description of each prescribed BMP provided as well? 5.34 Structural Source Control BMPs: Does the project properly prescribe structural source control BMPs include valid explanations for those that are not used? Are implementation responsibilities identified and description of each prescribed BMP provided as well? ---PAGE BREAK--- WQMP CHECKLIST Page 10 WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 5.35 Are proper and accepted terminology, consistent with CASQA or other industry standards, used to describe all structural BMPs? 5.36 If applicable, does the project lists and appropriately calculates any applicable Water Quality Credits? 5.37 If applicable, does the project describe an alternative compliance plan including obligations and proposed alternative compliance measures? Comments – Section 5 Section 6 - Inspection/Maintenance Responsibility for BMPs WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 6.1 Is the Operation and Maintenance Matrix completed with all source control BMPs, LID, Treatment, Trash (FCS require annual inspection/maintenance) and Pre-treatment BMPs selected for the project? Is the O&M Plan and specific O&M Fact Sheets/Guides for LID or Proprietary BMPs included as an attachment? 6.2 Does the O&M Plan identify an appropriate mechanism for the long-term operation and maintenance, including funding? 6.3 Does the O&M Section identify the entity (or entities) responsible for the long-term inspection and maintenance of all Source Control BMPs and any Treatment Control BMPs, including name, title, company, address, and phone number. 6.4 Does the O&M Plan prescribe appropriate minimum frequencies for inspection and maintenance of BMPs to ensure their continued effectiveness? 6.5 In order to ensure that the current owner recognizes that upon sale or transfer of property, the Notice of Transfer of Responsibility must be completed, is this form included in the Attachments (see Exhibit D in link below)? Water-Quality-Control-PDF 6.6 Is the Project subject to cross-lot drainage? ---PAGE BREAK--- WQMP CHECKLIST Page 11 6.7 If the Project has BMPs within the City’s ROW that the City will be responsible for inspection/maintenance, is the Operations ROW BMP Acceptance Memo included in the Attachments of the WQMP? Comments – Section 6 Section 7 –BMP Exhibit (Site Plan) WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 7.1 Has a 24” by 36” exhibit been included? (see prior comments in Section 4 regarding deficiencies) 7.2 Do all figures, maps, exhibits, etc. have a legend, including a North arrow and scale? 7.3 Are BMPs labeled and is enough detail provided to allow a Site Manager the ability to understand what is in place and how it operates and is maintained? 7.4 Are locations of roof downspouts identified to ensure runoff from buildings are appropriately routed as depicted by the DMAs? 7.5 Does the exhibit provide the following minimum information? • Project location; • Site boundary and easements, if any; • Drainage delineations (DMAs) and flow information, including storm drain facilities. • Drainage connections, • Paved parking) versus landscaped surfaces; • BMP cross section details; • Structural Source Control BMP locations; and • GIS Coordinates of LID/Treatment/Hydromodification BMPs in decimal degrees; 7.6 Does the storm drain and BMPs follow the elegant and efficient design criteria detailed in the City of Anaheim BMP Design Guidelines and WQMP Template? 7.7 Has a ROW Significant Redevelopment Footprint Exhibit been included, following the criteria and examples outlined in Section VII.2 of the WQMP Template? 7.8 Do the grading plans include the WQMP exhibit as a sheet? ---PAGE BREAK--- WQMP CHECKLIST Page 12 WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 7.9 Is the project grading plan consistent with WQMP exhibit? 7.10 Do the grading plans have the following note if infiltration BMPs are proposed: "During the construction phase of this project, the infiltration system shall be physically separated/ protected from runoff and/or any other material/liquid/debris. Should construction phase runoff enter the infiltration system, the contractor will be required to test the infiltration rate - using a method approved by the City - to demonstrate the performance meets or exceeds the WQMP design. Should the test show infiltration rates below those indicated in the WQMP, redesign (expansion or addition to the infiltration system) will be required in order to achieve the required infiltration rate."? 7.11 City Water Utility Well Permit: If a well (e.g. stormwater infiltration well) is proposed, has the requirement for a Well Permit been identified on the grading plans? Comments – Section 7 Section 8 – Educational Materials WQMP REQUIREMENT Requirement Satisfied? Yes No N/A 8.1 Are all applicable educational materials that will be used by the project identified, including reference to Orange County Watershed websites where the brochures or BMP fact sheets can be found (do not include brochures as an Attachment in the WQMP)? Comments – Section 8 ---PAGE BREAK--- WQMP CHECKLIST Page 13 WQMP Completion and Approval Process The Plan Checker will review the WQMP as many times as necessary to ensure that the WQMP meets the minimum City and County requirements. Once the WQMP plan check is complete, the Plan Checker will ensure the following items have been executed (if applicable). WQMP Completion and Approval Checklist (Internal Use Only) WQMP REQUIREMENT Requirement Satisfied? Yes N/A Plan Checker has contacted the Case Engineer via phone to discuss WQMP approval and has obtained approval to begin electronic approval coordination. Voicemail is not an acceptable form of contact. Projects with focused Infiltration BMPs: During Preliminary WQMP plan check, OCWD Coordination has been completed and infiltration BMPs have been reviewed by OCWD. Focused Infiltration BMPs are defined as all infiltration BMPs with the exception of permeable pavement (if less than a 25:1 surface area to tributary area ratio), bioretention without underdrains and self-treating areas. This correspondence should happen as early on as possible in plan check process. Projects with BMPs in Public Right-of-Way: WQMP includes an Attachment indicating the public agency’s intent to accept the BMPs as designed. Public Works Operations Department has been contacted and Operations ROW BMP Acceptance Memo has been signed and approved. This should occur early on in Final WQMP plan check process. Projects with Cross-Lot Drainage from multiple parcels to sub regional treatment control BMP(s): WQMP includes an Attachment of the executed and approved rights and responsibilities documentation Cross Lot Drainage Agreements) and agreement demonstrating shared responsibility to maintain treatment control BMP(s). Completed By: Signature: Date: