Full Text
GREEN BUILDING NONRESIDENTIAL CERTIFICATION CHECKLIST AT FINAL INSPECTION As contractor/architect/owner/engineer, I certify that the following green building code requirements have been incorporated into the new residential building at authorized by building permit # Bicycle parking has been installed per Item 1 on the Green Building Mandatory Nonresidential Requirements document. Designed parking for fuel efficient and carpool/van pool vehicles has been installed per Item 2 on the Light pollution reduction has been accomplished per Item 3 on the Indoor water use reduction has been accomplished per Item 4 on the Outdoor water use reduction has been accomplished per Item 5 on the Water resistance and moisture management has been implemented per Item 6 on the Recycling areas have been provided and identified per item 7 on the Commissioning report provided per Item 8 on the (buildings >10,000 A copy of the Operational and Maintenance Manual required by the has been placed at the site and has or will be transferred to the owner. Testing and adjusting plan provided per Item 9 on the (for buildings under 10,000 sq. ft.). Fireplaces and woodstoves in compliance with Item 10 on the Ducts and air distribution openings were covered during construction per Item 11 on the Adhesives, sealants, and caulks meet the requirements of Item 12 of the Paints and coatings are in compliance with Item 13 of the Aerosol paints and coatings are in compliance with Item 14 of the Carpet systems are in compliance with Item 15 of the Composite wood products are in compliance with Item 16 of the Resilient flooring systems are in compliance with Item 17 of the Air filters are in compliance with Item 18 of the Outdoor smoking areas posted with signage in compliance with Item 19 of Building sound transmission control systems installed in compliance with Item 20 of the Chlorofluorocarbons (CFSs) and Halons have not been installed in HVAC, refrigeration, or fire suppression systems per Item 21 of the I have reviewed all of the above items and the Mandatory Measures incorporated into the plans and find this project in compliance with the CAL Green Code. Signature Date Printed Name Phone # E-mail