← Back to Anaheim, CA

Document Anaheim_doc_6f3105b0e1

Full Text

FILENAME: REVISION KEYS: ADDED / REVISED TEXT CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT NEW SHEET NEW SHEET OIL SENSING SUMP PUMP INSTALLATION IN VAULTS CU1700-8 REV3 3 01-16 1 6 CU 1700-8 SUMP PUMP INSTALLATION CRITERIA AND DETAIL: SCOPE: THIS STANDARD SHOWS INSTALLATION AND APPLICATION OF OIL SENSING SUMP PUMP IN VAULT FOR ELECTRICAL AND OR ELECTRONIC EQUIPMENT. DO NOT INSTALL SUMP PUMPS IN VAULTS USED ONLY FOR CABLE AND NON-SEPARABLE CONNECTOR APPLICATIONS. 1. VAULTS WHICH WILL HOUSE SWITCH(ES), S.C.A.D.A. & ELECTRONIC EQUIPMENT,3KV SURGE ARRESTER FOR 69KV SPLICES ETC., INSTALL SUMP PUMP AND ACCESSORIES PER THIS STANDARD. 2. DISCHARGE PLUMBING THRU AIR VENT DUCT TO A POINT 12 INCHES INSIDE VAULT. INSTALL A TEMPORARY CAP ON PORTION INSIDE VAULT. INSTALL THE ELECTRIC CONDUIT THAT WILL BE USED FOR THE SERVICE TO THE PUMP IN A CONDUIT TERMINATOR AND EXTEND TO THE SOURCE OR FUTURE SOURCE OF POWER. 3. CURB DISCHARGE OUTLET MAY BE USED IN LIEU OF AIR VENT DISCHARGE OUTLET DUE TO DESIGN OR EXISTING CONDITIONS. ELECTRICAL ENGINEERING DIV. TO SPECIFY DISCHARGE OUTLET TYPE AND LOCATION ON WORK ORDER DRAWINGS. DISCHARGE MUST BE TO GUTTER DIRECTLY OR THRU CORE DRILL. DO NOT DIRECT DISCHARGE FLOW TO SOFT OR LANDSCAPED SURFACES/ AREAS. 4. INSTALL LONGER PROBE OF OIL SENSING SWITCH 2" ABOVE FLOOR AS SHOWN ON SH. 2 & 3. 5. SERVICE VOLTAGE TO PUMP & SWITCH IS 120VAC ONLY. ---PAGE BREAK--- GRADE SUMP HOLE CORE DRILL CURB FOR 2" PVC CONDUIT SEE NOTE B 10" AIR VENT 10"-12" FLOOR SEE NOTE G 2" 27/210 /#07#.1((#761 9 6 4 2 10 23 14 5 23 13 6 23 6 5 9 8 12 7 5 1 2 3 316" DIA. HOLE, DRILL HOLE AWAY FROM PUMP CONTROL 11 2" (NOTE 5) 9" 2' MIN. 17 3 ELECTRIC PANEL SEE SH 4 FOR CONNECTION DIAGRAM SEE NOTE B 15 3 1 9 4 2" (NOTE 5) 15 OIL SENSING SWITCH 1 10" PVC VENT STANDPIPE PER CU 1700-6 SEE NOTE B 12 DRILL 2" HOLE IN STANDPIPE 16 19 SEE NOTE A TO 120V SUPPLY 22 2 20 4 SEE NOTE H 21 FILENAME: REVISION KEYS: ADDED / REVISED TEXT CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT NEW SHEET NEW SHEET OIL SENSING SUMP PUMP INSTALLATION IN VAULTS CU1700-8 REV3 3 01-16 2 6 CU 1700-8 SCOPE: THIS STANDARD SHOWS INSTALLATION AND APPLICATION OF SUMP PUMP IN VAULT. OPTION 1 NEW INSTALLATION ---PAGE BREAK--- GRADE SUMP HOLE CORE DRILL CURB FOR 2" PVC CONDUIT SEE NOTE B 10" AIR VENT 10"-12" FLOOR SEE NOTE G 2" 27/210 /#07#.1((#761 9 6 4 2 10 10 5 10 13 6 10 6 5 9 8 12 7 2 316" DIA. HOLE, DRILL HOLE AWAY FROM PUMP CONTROL 2" (NOTE 5) 9" 2' MIN. 17 3 ELECTRIC PANEL SEE SH 4 FOR CONNECTION DIAGRAM SEE NOTE B 15 3 1 9 4 2" (NOTE 5) 15 OIL SENSING SWITCH 1 10" PVC VENT STANDPIPE PER CU 1700-6 SEE NOTE B 2 3 14 11 12 DRILL 2" HOLE IN STANDPIPE 20 16 19 SEE NOTE A TO 120V SUPPLY 22 20 2 4 SEE NOTE H 21 FILENAME: REVISION KEYS: ADDED / REVISED TEXT CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT NEW SHEET NEW SHEET OIL SENSING SUMP PUMP INSTALLATION IN VAULTS CU1700-8 REV3 3 01-16 3 6 CU 1700-8 SCOPE: THIS STANDARD SHOWS INSTALLATION AND APPLICATION OF SUMP PUMP IN VAULT. OPTION 2 RETROFIT ---PAGE BREAK--- PUMP MOTOR 4 5 2 6 4 8 20A CB T1 T2 C1 HAND OFF AUTO G PUMP ON C1 0 1 6 8 7 OIL SMART WATER PUMP SWITCH WHITE BLACK YELLOW WHITE BLACK BROWN MOTOR CONTACTOR BLACK 120VAC RED BLACK PUMP TERMINAL BLOCK PUMP TERMINAL BLOCK SCHEMATIC DIAGRAM 120V 10' SOURCE LEAD BLACK - PHASE WHITE - NEUTRAL BROWN - GROUND FILENAME: REVISION KEYS: ADDED / REVISED TEXT CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT NEW SHEET NEW SHEET OIL SENSING SUMP PUMP INSTALLATION IN VAULTS CU1700-8 REV3 3 01-16 4 6 CU 1700-8 ---PAGE BREAK--- FILENAME: REVISION KEYS: ADDED / REVISED TEXT CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT NEW SHEET NEW SHEET OIL SENSING SUMP PUMP INSTALLATION IN VAULTS CU1700-8 REV3 3 01-16 5 6 CU 1700-8 ITEM QTY DESCRIPTION ANAHEIM PART NO. COMPATIBLE UNITS MFR/ PART NO. 1 1 12 HP DURABLE CAST IRON CONSTRUCTION HIGH HEAD PUMP WITH AUTOMATIC THERMAL LOAD PROTECTION, 20' CORD. (NOTE I) 486330 VPUMP-OILSENS ZOLLER /#153 2 AS REQ'D CONDUIT, 1 1/4" PVC SCH. 40 (NOTE F) - - 3 AS REQ'D HOSE, 1 1/4" FLEX. PLASTIC (GEN-LINE) (NOTE F) - - 4 3 INSERT, 1 1/4" FIP TO HOSE, PVC- INSE 4204 2420 (NOTE F,H) - - 5 1 CONDUIT, 2" PVC SCH 40 (NOTE F) - - 6 3 ADAPTER, 1 1/4" FEMALE TO 1 1/4" MIP, PVC (NOTE F) - - 7 AS REQ'D COUPLING, 1 1/4" PVC (NOTE F) - - 8 AS REQ,D PIPE STRAPS, 1 1/4" GALV. (NOTE F) - - 9 3 CLAMP, HOSE, 1 1/4" SS, WORM DR, HD (NOTE F) - - 10 3 127() - - 11 AS REQ'D UNISTRUT - AS NEEDED-CUT TO FIT E448075M UNI 10 12 AS REQ'D CONCRETE ANCHOR INSERT 1/2" X 2 1/4" G987220M - 13 1 PROTECTION DRAIN FITTING 2" - - 14 1 TYPE 6P ENCLOSURE COMPONENTS & LEADS (NOTE I) 486340 SEE WATER #CP1022 15 1 OIL SMART SWITCH W/20' CORD AND MOUNTING HARDWARE (NOTE I) 486335 VPUMP-OILSWITCH SEE WATER #OSS2OR6 16 1 1 1/2" MALE TO 1 1/4" FEMALE REDUCER ADAPTOR 980369 42310 (NOTE F) - - 17 1 1/4" X 10" M-M PVC (NOTE F) 18 - NOT USED - - 19 - REDUCER BUSHING, 2" TO 1 1/4" PVC (NOTE F) - - 20 1 CHECK VALVE -1 1/4"- BELL #SPE4522012. ( NOTE F,H) - - 21 1 FEMALE ADAPTOR 1 1/4" BELL #980372 24080. (NOTE F) - - 22 1 SLIP/SLIP-1 1/4" X P8,BUS BELL #[PHONE REDACTED] (NOTE F) - - 23 3 127() - - MATERIAL LIST NOTES; A. PROVIDE A SINGLE PHASE SERVICE TO POWER CORD .INSTALL WATERPROOF SPLICE WITH AQUA SEAL AND TAPE. B. INSTALL CURB OUTLET OR AIR VENT OUTLET IN SIDE OF GUTTER FLOW FROM VAULT. DO NOT INSTALL VENT OUTLET ON PRIVATE PROPERTY OR BACK SIDE OF SIDEWALK. SEE NOTE 3. C. CEMENT TOGETHER PVC MALE/FEMALE THREADED FITTINGS EXCEPT AT SUMP PUMP DISCHARGE. D. CONNECT SUMP PUMP GROUND TO VAULT GROUND USING #8 CU. WIRE. E. FOR CURB DISCHARGE, EXIT VAULT THRU UPPER MOST UNUSED CONDUIT TERMINATOR, OR CORE DRILL VAULT ROOF, ABOVE SUMP PUMP LOCATION. SEAL JOINT BETWEEN CONDUIT AND VAULT. F. AVAILABLE THRU BELL PIPE AIR SUPPLY, ANAHEIM, CA. G. FOR CURB DISCHARGE, EXIT VAULT THRU UPPERMOST UNUSED CONDUIT TERMINATOR OR CORE DRILL VAULT ROOF ABOVE SUMP PUMP LOCATION. SEAL JOINT BETWEEN CONDUIT AND VAULT. H. CHECK VALVE COMES WITH ADAPTORS FOR FLEX AND PVC CONNECTIONS. I. AVAILABLE THRU SEEWATER INC. WWW. SEEWATERINC.COM J. INSTALL CONTROL ENCLOSURE NEAR THE VAULT LID ACCESSIBLE FROM OUTSIDE WITHOUT ENTERING THE VAULT. OPTION 1 NEW INSTALLATION ---PAGE BREAK--- FILENAME: REVISION KEYS: ADDED / REVISED TEXT CONSTRUCTION STANDARD: ADDED / REVISED MATERIAL SHEET OF REVISION NO. ISSUE DATE : APPROVALS CITY OF ANAHEIM ELECTRICAL DIVISION PUBLIC UTILITIES DEPARTMENT T&D CONSTRUCTION STANDARDS SUB MAINT NEW SHEET NEW SHEET OIL SENSING SUMP PUMP INSTALLATION IN VAULTS CU1700-8 REV3 3 01-16 6 6 CU 1700-8 ITEM QTY DESCRIPTION ANAHEIM PART NO. COMPATIBLE UNITS MFR/ PART NO. 1 1 12 HPDURABLE CAST IRON CONSTRUCTION HIGH HEAD PUMP WITH AUTOMATIC THERMAL LOAD PROTECTION, 20' CORD. (NOTE I) 486330 VPUMP-OILSENS ZOLLER # 153 4 3 * INSERT, FIP TO HOSE, PVC (NOTE F) - - - 9 3 * CLAMP, HOSE, SS, WORM DR, HD (NOTE F) - - - 11 1 UNISTRUT - AS NEEDED-CUT TO FIT E448075M UNI 10 - 12 AS REQ'D CONCRETE ANCHOR INSERT 1/2" X 2 1/4" G987220M - - 14 1 TYPE 6P ENCLOSURE COMPONENTS & LEADS. (NOTE I) 486340 SEE WATER #CP1022 15 1 OIL SMART SWITCH W/20' CORD AND MOUNTING HARDWARE (NOTE I) 486335 VPUMP-OILSWITCH SEE WATER #OSS20R6 16 1 1 1/2" MALE & 1 1/4" FEMALE REDUCER ADAPTOR. 980369 42310 (NOTE F) - - - 17 1 1 1/4" X 10" M-M PVC (NOTE F) - - - 18 - NOT USED - - - 20 1 CHECK VALVE -1 1/4"- BELL #SPE4522012. (NOTE F&H) - - - 21 1 FEMALE ADAPTOR 1 1/4" BELL #980372 24080. (NOTE F) - - - 22 1 SLIP/SLIP-1 1/4" X P8,BUS BELL #[PHONE REDACTED] (NOTE F) - - - MATERIAL LIST NOTES; A. PROVIDE A SINGLE PHASE SERVICE TO POWER CORD .INSTALL WATERPROOF SPLICE WITH AQUA SEAL AND TAPE. B. INSTALL CURB OUTLET OR AIR VENT OUTLET IN SIDE OF GUTTER FLOW FROM VAULT. DO NOT INSTALL VENT OUTLET ON PRIVATE PROPERTY OR BACK SIDE OF SIDEWALK. SEE NOTE 3. C. CEMENT TOGETHER PVC MALE/FEMALE THREADED FITTINGS EXCEPT AT SUMP PUMP DISCHARGE. D. CONNECT SUMP PUMP GROUND TO VAULT GROUND USING #8 CU. WIRE. E. FOR CURB DISCHARGE, EXIT VAULT THRU UPPER MOST UNUSED CONDUIT TERMINATOR, OR CORE DRILL VAULT ROOF, ABOVE SUMP PUMP LOCATION. SEAL JOINT BETWEEN CONDUIT AND VAULT. F. AVAILABLE THRU BELL PIPE AIR SUPPLY, ANAHEIM, CA. H. CHECK VALVE COMES WITH ADAPTORS FOR FLEX AND PVC CONNECTIONS. I. AVAILABLE THRU SEEWATER INC. WWW. SEEWATERINC.COM J. INSTALL CONTROL ENCLOSURE NEAR THE VAULT LID ACCESSIBLE FROM OUTSIDE WITHOUT ENTERING THE VAULT. MATCH EXISTING OPTION 2 RETROFIT *