CITY OF ANAHEIM ELECTRIC RATES, RULES Utilities Financial Services AND REGULATIONS 201 S. Anaheim Blvd. Page No. 2.3.1 Anaheim, CA 92805 SCHEDULE GS-2 GENERAL SERVICE ISSUED BY: Effective: 05-01-24 by Resolution No.: 2024-022 Dated: 03-26-24 Dukku Lee Superseding Resolution No.: 2022-018 Dated: 02-15-22 General Manager APPLICABILITY Applicable to single and three phase General Service including lighting and power. This Rate Schedule is mandatory for all Customers whose Maximum Demand has exceeded 200 kW for any three Months during the preceding twelve (12) Months and whose average demand for the preceding twelve (12) Months also exceeds 200 kW. Any Customer whose Maximum Demand has fallen below 200 kW for any three Months during the preceding twelve (12) Months and whose average demand for the preceding twelve (12) Months also is less than 200 kW may elect to take service under Rate B of Schedule GS-1. RATE (21) Per Meter, Per Month Service delivered at voltages of 50 kV and below Customer Charge: $ 370.00 Demand Charge (added to Customer Charge): First 200 kW or less of Billing Demand $ 3,726.00 All excess kW of Billing Demand, per kW $ 21.10 Energy Charge (added to Demand Charge): First 540 kWh per kW of Billing Demand, per kWh 13.03¢ All excess kWh, per kWh 9.00¢ Minimum Charge: The minimum charge is the Demand Charge and the Customer Charge. Service delivered at voltages above 50 kV Customer Charge $ 370.00 Demand Charge (added to Customer Charge): First 200 kW or less of Billing Demand $ 2,931.00 All excess kW of Billing Demand, per kW $ 17.00 Energy Charge (added to Demand Charge): First 540 kWh per kW of Billing Demand, per kWh 12.51¢ All excess kWh, per kWh 8.00¢ Minimum Charge: The minimum charge is the Demand Charge and the Customer Charge. SPECIAL CONDITIONS A. Service voltage in accordance with the Rates, Rules and Regulations. (Continued) ---PAGE BREAK--- CITY OF ANAHEIM ELECTRIC RATES, RULES Utilities Financial Services AND REGULATIONS 201 S. Anaheim Blvd. Page No. 2.3.2 Anaheim, CA 92805 SCHEDULE GS-2 GENERAL SERVICE ISSUED BY: Effective: 05-01-24 by Resolution No.: 2024-022 Dated: 03-26-24 Dukku Lee Superseding Resolution No.: 2022-018 Dated: 02-15-22 General Manager SPECIAL CONDITIONS (Continued) B. Billing Demand Billing Demand will be measured at fifteen (15) minute intervals, by instruments supplied, owned, and maintained by the City at the City’s expense upon the Customer’s Premises. The Billing Demand will be the greater of: 1) the highest metered kilowatt input for the Billing Period; 2) 50% of the contracted for or connected load; or 3) 50% of the highest Billing Demand in the preceding eleven (11) Billing Periods. C. Power Factor Adjustment The charges will be adjusted each Month for the Power Factor as follows: The charges will be increased by thirty-one cents ($0.31) per kilovar of reactive demand. The kilovars of reactive demand shall be calculated by multiplying the kilowatts of measured Maximum Demand by the ratio of the kilovar-hours to kilowatt-hours. D. Voltage Discount The charges, excluding the Customer Charge, Power Factor and Rate Stabilization Adjustment, will be reduced by three percent for service delivered at voltages from 2 kV to 10 kV and by six percent for service delivered at voltages from 11 kV to 50 kV; Customer equipment and metering per Utility standards. For service delivered at voltage levels above 50 kV, all charges will be assessed as set forth in the Rate Schedule above. E. Temporary Discontinuance of Service Where the use of energy is seasonal or intermittent, no adjustment will be made for a temporary reduction of load. Any Customer who resumes service within twelve (12) Months must pay all charges that would have been billed had service been continuous. F. Rate Stabilization Adjustment The rates above are subject to adjustment as provided for in Schedule RSA. The applicable billing factor set forth in Schedule RSA will be applied to all kilowatt-hours billed under this Rate Schedule.