← Back to Anaheim, CA

Document Anaheim_doc_406def78e5

Full Text

City of Anaheim CONSTRUCTION NOTICE PUBLIC WORKS PROJECT WHERE: Katella Avenue Improvements LIMITS: From Lewis Street to State College Boulevard BEGINS: February 2014 COMPLETION: June 2015 TYPE OF WORK: Roadway widening and paving, concrete hardscape improvements, construction of raised median, traffic signal, street lighting, utility, sewer, drainage landscape and irrigation improvements. TRAFFIC IMPACT: During construction, there will be Traffic Lane Closures; therefore, traffic disruptions shall be expected. PARKING: “NO Parking” signs will be posted in advance to restrict parking in construction zones. Please adhere to the dates and hours on the posted o parking signs. PESDESTRIAN ACCESS: Please note that there will be portions of sidewalk curb and gutter, and driveways closed for reconstruction; so please use caution and obey all detour and traffic control signs in the vicinity of the project. DRIVEWAY ACCESS: Every effort will be made to keep driveways open at all times, but there will be times when driveways will be temporarily inaccessible due to re-construction or pavement reconstruction in front of driveways CONTRACTOR: GMC Engineering (714) 247-1040 FOREMEN: Ernie Beas (714) 412-1411 CITY INSPECTOR: Alan Braatvedt (714) 525-0684 The City will be working with the contractor to complete the project with minimum inconvenience to you. Thank you for your cooperation