← Back to Anaheim, CA

Document Anaheim_doc_196d94835f

Full Text

The Disneyland Resort Specific Plan (SP92-1) City of Anaheim Adopted June 29, 1993 Amendment April 12, 1994 Amendment # 2, June 20, 1995 Amendment # 3, October 22, 1996 Amendment # 4 July 13, 1999 Amendment # 5, March 19, 2002 Amendment # 6, April 25, 2006 Amendment April 24, 2007 Amendment August 23, 2011 Adjustment # 1, September 16, 1997 Adjustment # 2, Not Used Adjustment # 3, September 19, 2000 Adjustment # 4, May 1, 2001 Adjustment # 5, May 5, 2003 Adjustment # 6, August 22, 2006 Adjustment # 7, January 29, 2008 Zoning Code Revision, May 25, 2004 Prepared for: THE CITY OF ANAHEIM Civic Center P.O. Box 3222 Anaheim, California 92803 (714) 765-5139 ---PAGE BREAK--- ---PAGE BREAK--- I Section 1: Executive Summary 1.1 Purpose of the Specific Plan 1-1 1.2 Organization of the Specific Plan Document 1-1 1.3 Existing Setting 1-2 1.4 Implementing the General Plan 1-2 1.5 Project Goals 1-3 1.6 Summary of Districts 1-4 1.6.1 Theme Park District 1-5 1.6.2 Hotel District 1-6 1.6.3 Parking District 1-6 1.6.3.5 District A 1-7 1 .6.4 Future Expansion District 1-7 1.6.5 C-R Overlay 1-8 1.6.5.5 Pointe* Anaheim Overlay 1-8 1.6.6 Development Plan 1-9 1.7 Implementing the Specific Plan 1-13 Section 2: Planning Context 2.1 Purpose of the Specific Plan 2-1 2.2 Specific Plan Policies 2-1. 2.2.1 Create an Urban Destination Resort 2-2 2.2.2 Establish a Unified Resort Identity 2-2 2.2.3 Supply Visitor Facilities to Meet Long-Term Demand 2-2 2.2.4 Improve Public Facilities and Infrastructure to Accommodate Growth 2-3 2.2.5 Improve the Transportation System 2-4 2.2.6 Develop Implementation Mechanisms to Assure Quality Development 2-4 2.2.7 Enhance and Protect Surrounding Uses 2-4 2.3 Authority and Scope of the Specific Plan 2-5 2.4 Relationship to City Planning Documents and Regulations 2-6 2.4.1 Relationship to the General Plan 2-6 2.4.2 Relationship to Zoning Ordinance 2-6 2.4.3 CEQA Requirements 2-7 2.4.4 Relationship to the Anaheim Resort Specific Plan No. 92-2 and Environmental Impact Report (EIR) No. 313 2-8 Section 3: Land Use Plan 3.1 Regional Location 3-1 3.2 Existing Conditions 3-1 3.2.1 The Specific Plan Area 3-1 3.2.2 Existing Uses 3-2 3.3 Land Use Plan 3-6 3.3.1 Theme Park District 3-9 3.3.2 Hotel District 3-13 3.3.3 Parking District 3-17 3.3.3.5 District A 3-19 3.3.4 Future Expansion District 3-19 3.3.5 C-R Overlay 3-20 3.3.6 Pointe*Anaheim Overlay 3-23 3.4 Phasing Plan 3-29 3.4.1 Phase I (1996) 3-30 3.4.2 Phase II (2001) 3-33 3.4.3 Phase III (2010) 3-34 ---PAGE BREAK--- The Disneyland Resort Specific Plan Section 9.0: Legal Description II Section 4: Public Facilities Plan 4.1 Regional Circulation Programs 4-1 4.2 Regional Infrastructure Programs 4-2 4.3 Vehicular Circulation Plan 4-2 4.3.1 Connections to Interstate 5 4-4 4.3.2 Arterial/Secondary System 4-10 4.4 Mass Transit Circulation Plan 4-24 4.4.1 The Resort Mass Transit System 4-24 4.4.2 Related Mass Transit Systems 4-26 4.5 Pedestrian Circulation Plan 4-28 4.6 Water 4-30 4.7 Sanitary Sewer 4-32 4.8 Storm Drain 4-35 4.9 Electricity 4-37 4.10 Natural Gas 4-38 4.11 Telecommunications 4-38 4.12 Television Service 4-38 4.13 Solid Waste 4-38 4.14 Public Services 4-39 4.15 Landscape 4-41 Section 5: Design Plan 5.1 Design Plan Objectives 5-2 5.1.1 Create Visual Continuity Between The Disneyland Resort and the Surrounding Anaheim Resort 5-3 5.1.2 Create a High Quality, Visually Appealing, Pedestrian-oriented Environment 5-3 5.1.3 Protect the Visual Integrity of the Theme Parks 5-3 5.2 Design Concepts 5-4 5.2.1 Transform and Unify with Landscape 5-4 5.2.2 Create a District with a Civic Scale 5-4 5:2.3 Emphasize the Landscape on the Public Streets 5-5 5.2.4 Orient Visitors Visually 5-5 5.2.5 Create a Recognizable Center for the Anaheim Resort 5-6 5.2.6 Coordinate Streetscape Improvements with Other Improvements 5-6 5.2.7 Establish a Clear Design Hierarchy 5-6 5.3 Landscape Concept Plan 5-7 5.3.1 Landscape Concepts 5-8 5.3.2 Plant Material Selection and Use 5-11 5.3.3 Layered Landscape Design Criteria 5-15 5.3.4 Landscape Concept Diagram 5-19 5.3.5 Landscape Cross Sections 5-19 5.4 Identity Concept Plan 5-26 5.4.1 Identity and Sign Concepts 5-27 5.4.2 Identity Elements 5-29 5.4.3 Sign Elements 5-33 5.5 Design Criteria for the Public Realm 5-37 5.5.1 Interstate 5 and the Major Interchanges 5-39 5.5.2 The Arrival Gateways 5-40 5.5.3 The Public Streets 5-44 5.6 Design Criteria for the Setback Realm 5-52 5.6.1 Exterior Lighting 5-52 5.6.2 Freestanding Sign Guidelines and Standards 5-55 ---PAGE BREAK--- III 5.6.3 The New Theme Park Setbacks 5-55 5.6.4 The Eastern Gateway 5-57 5.6.5 Western Gateway 5-58 5.6.6 West Street/Disneyland Drive Hotel Setbacks 5-58 5.6.7 Disneyland Theme Park Back-of-House Setbacks 5-60 5.6.8 Parking Facility Setbacks 5-64 5.6.9 Interior Setbacks 5-69 5.6.10 Minimum Landscape Requirements 5-70 5.7 Design Criteria for the Private Realm 5-79 5.7.1 Organization of Private Realm Design Standards and Guidelines 5-79 5.7.2 General Site Planning 5-81 5.7.3 Theme Park Back-of-house Service Areas 5-83 5.7.4 Service and Loading Areas 5-89 5.7.5 Exterior Lighting 5-90 5.7.6 Surface Parking Areas 5-91 5.7.7 Parking Structure Appearance 5-94 5.7.8 Special Parking Facility Layout Guidelines 5-96 5.7.9 Building Appearance 5-102 5.7.10 Signs 5-107 5.7.11 Landscape 5-115 5.8 Design Plan Reference Summary 5-120 5.8.1 Full-Street Reference Plan and Cross Sections 5-120 5.8.2 Half-Street Reference Plan and Cross Sections 5-132 5.8.3 District Concept Plans 5-176 5.8.4 Plant Selection Matrix 5-186 Section 6: General Plan Consistency 6.1 General Community Objectives and Policies 6-1 6.1.1 General Community Objective 1 6-1 6.1.2 General Community Objective 2 6-2 6.1.3 General Community Objective 3 6-3 6.1.4 General Community Objective 4 6-3 6.2 Land Use Element 6-4 6.2.1 Commercial Areas Goals and Policies 6-4 6.2.2 Community Services and Facilities Goals and Policies 6-8 6.2.3 Infrastructure Goals and Policies 6-9 6.3 Circulation Element 6-11 6.3.1 Goals and Policies 6-11 6.4 Environmental Resource and Management Element 6-13 6.4.1 Goal and Policies 1 6-13 6.4.2 Goal and Policies 2 6-14 6.5 Safety and Seismic Safety Element 6-14 6.5.1 Primary Safety Goal 6-14 6.5.2 Goal-Fire Prevention 6-14 6.5.3 Goal-Geologic Hazard 6-15 6.5.4 Goal-Flood Hazard 6-15 6.5.5 Goal-Disasters 6-16 6.6 Housing Element 6-16 6.6.1 Goal-Housing and Neighborhood Quality 6-16 6.6.2 Goal-Housing Affordability 6-17 6.7 Noise Element 6-18 6.7.1 Goals and Policies 6-18 ---PAGE BREAK--- The Disneyland Resort Specific Plan Section 9.0: Legal Description IV 6.8 Growth Management Element 6-20 6.8.1 Growth Management Goals and Policies for Land Use 6-20 6.8.2 Growth Management Goals and Policies for Community Services and Facilities 6-24 6.8.3 Growth Management Goals and Policies for Infrastructure 6-26 6.8.4 Growth Management Goals and Policies for Circulation 6-30 6.8.5 Growth Management Goals and Policies for Parks and Open Space 6-36 6.8.6 Growth Management Goals and Policies for Air Quality 6-36 6.9 Parks, Recreation and Community Services 6-38 6.9.1 Goal and Policies 1 6-38 6.9.2 Goal and Policies 2 6-39 6.9.3 Goal and Policies 3 6-40 6.9.4 Goal and Policies 4 6-40 6.10 Anaheim GardenWalk Overlay 6-41 Section 7: Zoning and Development Standards 18.114.010 Purpose and Intent. 18.114.020 General Provisions. 18.114.030 Definitions. 18.114.040 Methods and Procedures for Specific Plan Implementation. 18.114.050 Land Use and Site Development Standards-General. 18.114.060 Land Use and Site Development Standards-Theme Park District (Development Area 18.114.070 Land Use and Site Development Standards-Hotel District (Development Area 18.114.080 Land Use and Site Development Standards-Parking District (Development Areas 3a and 3b). 18.114.090 Land Use and Site Development Standards-Future Expansion District (Development Area 18.114.095 Land Use and Site Development Standards-District A. 18.114.100 C-R Overlay 18.114.105 Anaheim GardenWalk Overlay. 18.114.106 Central Core Provisions for Anaheim GardenWalk Overlay. 18.114.110 Off-Street Parking and Loading Requirements. 18.114.120 Requirements for Vacation Ownership Resorts. 18.114.130 Sign Regulations 18.114.140 Application Fees. 18.114.150 Development Review and Permits. 18.114.160 Dedication and Improvements. 18.114.170 Reclassification Procedure - Violation. 18.114.180 Penalties for Violations. 18.114.190 Amendments, Conditional Use Permits and Variances. 18.114.200 Non-applicability of Chapter to City Activities or Property. Section 8: Zoning Explanation 8.1 Purpose 8-1 8.2 Basic Principles 8-1 8.2.1 Provide More Detail and Greater Specificity 8-1 8.2.2 Minimize Need for Continuous Public Review 8-2 8.3 Land Use 8-2 8.3.1 Create Distinct Zoning Districts 8-2 8.3.2 Define Uses by District 8-3 ---PAGE BREAK--- V 8.3.3 Concept Plans 8-3 8.4 Development Standards 8-4 8.4.1 Development Intensity (Density) 8-4 8.4.2 Building Height 8-4 8.4.3 Setbacks 8-6 8.4.4 Landscaping 8-7 8.4.5 Parking Requirements 8-8 8.5 Other Considerations 8-9 8.5.1 Processing Requirements 8-9 8.5.2 Definitions 8-10 8.5.3 Temporary Uses 8-10 8.6 Signs 8-10 8.6.1 Sign Standards 8-10 8.6.2 Coordinated Sign Program 8-10 8.6.3 Permitted Signs 8-11 8.6.4 Conditionally Permitted Signs 8-11 8.6.5 Prohibited Signs 8-11 8.6.6 Sign Standards (Matrix) 8-11 8.6.7 Automotive Service Station Signs 8-13 8.6.8 Sign Illumination 8-14 8.7 Specific Plan Amendments 8-14 8.7.1 Amendment No. 1 8-14 8.7.2 Amendment No. 2 8-15 8.7.3 Amendment No. 3 8-15 8.7.4 Amendment No. 4 8-16 8.7.5 Amendment No. 5 8-17 8.7.6 Amendment No. 6 8-17 8.7.7 Amendment No. 7 8-20 8.7.8 Amendment No. 8 8-20 Section 9: Legal Description Section 10: General Plan Amendment 10-1 10.1 Introduction 10-1 10.2 General Plan Amendment Nos. 331, 333, 336, 359, and 393 10-4 10.3 General Plan Amendment No. 2005-00440 10-13 10.4 General Plan Amendment No. 2010-00481 10-14 Exhibits 1.6.6a The Disneyland Resort Development Area Summary Tabulation 1-9 1.6.6b The Disneyland Resort Development Plan 1-10 1.6.6c C-R Overlay 1-11 1.6.6d Anaheim Gardenwalk Overlay 1-12 3.1a Regional Location Map 3-1 3.2.1a The Disneyland Resort/Anaheim Resort Boundaries 3-3 3.2.2a Aerial Photograph with the Disneyland Resort Specific Plan and Anaheim Resort Boundaries 3-4 3.2.2b Existing Land Use 3-5 3.3a Land Use Plan Development Summary Table 3-7 3.3b Development Plan 3-8 3.3.1a Theme Park District Development Summary 3-12 3.3.2a Hotel District Development Program Summary 3-14 ---PAGE BREAK--- The Disneyland Resort Specific Plan Section 9.0: Legal Description VI 3.3.3a Parking District Development Program Summary 3-18 3.3.3.5a District A Development Program Summary 3-19 3.3.4a Future Expansion District Development Program Summary 3-20 3.3.5a C-R Overlay 3-21 3.3.5b C-R Overlay Potential Development Program Summary 3-22 3.3.6a Anaheim GardenWalk Overlay 3-24 3.3.6b Anaheim GardenWalk Overlay Development program 3-25 3.4a Phasing Plan 3-31 3.4b Phasing Plan for Anaheim GardenWalk 3-32 4.1a Existing Circulation 4-3 4.3.1a Access to Parking Facilities 4-7 4.3.1b Proposed Interstate 5-West Street/Disneyland Drive Interchange 4-8 4.3.1c Proposed Interstate 5-Katella Avenue Interchange 4-9 4.3.2a Vehicular Circulation Plan 4-11 4.3.2b Proposed West Street/Disneyland Drive from Ball Road to south of the West Parking Area 4-12 4.3.2c Proposed West Street/Disneyland Drive Cross Section South of West Parking Area to Katella Avenue 4-13 4.3.2d Proposed West Place Cross Section (formerly West Street south of Ball Road) 4-14 4.3.2e Proposed Disney Way Cross Section (east of East Parking Area access points) 4-15 4.3.2f Proposed Disney Way Cross Section (west of East Parking Area access points) 4-15 4.3.2g Interim Katella Avenue Cross Section between Interstate 5 and West Street/Disneyland Drive 4-16 4.3.2h Ultimate Katella Avenue Cross Section between Interstate 5 and West Street/Disneyland Drive 4-17 4.3.2i Ultimate Katella Avenue Cross Section between Walnut Street and West Street/Disneyland Drive 4-17 4.3.2j Proposed Walnut Street Cross Section 4-19 4.3.2k Proposed Harbor Boulevard Cross Section 4-19 4.3.2l Harbor Boulevard adjacent to Disneyland Back-of-House between Interstate 5 and 250 feet north of Disney Way 4-20 4.3.2m Ball Road Cross Section (with landscaped median) 4-20 4.3.2n Ball Road Cross Section (with painted median) 4-21 4.3.2o Proposed Cerritos Avenue Cross Section 4-21 4.3.2p(1) Clementine Street Cross Section at, and s/o Fire Station and n/o Signalized Intersection at Katella Avenue 4-22 4.3.2p(2) Clementine Street Cross Section s/o Signalized Intersection at Katella Avenue 4-22 4.3.2p Haster Street Cross Section 4-23 4.4a Mass Transit Systems 4-25 4.4.2a Conceptual Diagram for Theme Park Drop-off Area 4-27 4.5a Public Pedestrian Circulation 4-29 4.6a Water System Improvements4-31 4.7a Sewer System Improvements 4-34 4.8a Storm Drain System Improvements 4-36 4.15a Landscape Installation 4-42 5.3.1.1a Unity and Diversity 5-8 5.3.1.2a Landscape Reflects Scale 5-9 5.3.1.5a Layered Landscape Creates Depth 5-10 5.3.3a Layered Landscape Design Criteria for Properties with Frontages Greater than 300 Feet 5-16 5.3.3b Layered Landscape Design Criteria for Properties with Frontages Less than 300 Feet 5-17 ---PAGE BREAK--- VII 5.3.3c Elevation of East Parking Area from Clementine Street Showing Layered Landscape 5-17 5.3.3d Layered Landscape Setback Width Criteria 5-18 5.3.3e Elevation of Theme Park District from Katella Avenue Showing Layered Landscape 5-18 5.3.3f Elevation of Parking Facilities in Hotel District from Walnut Street Showing Layered Landscape 5-19 5.3.4a Landscape Concept Diagram 5-20 5.3.5a Landscape Cross Section: West Street/Disneyland Drive 5-21 5.3.5b Landscape Cross Section: Harbor Boulevard 5-22 5.3.5c Landscape Cross Section: Katella Avenue (Interim Condition) 5-22 5.3.5d Landscape Cross Section: Walnut Street 5-23 5.3.5e Landscape Cross Section: Ball Road 5-23 5.3.5f Landscape Cross Section: Disney Way 5-24 5.3.5g Landscape Cross Section: Clementine Street 5-24 5.3.5h Landscape Cross Section: Cerritos Avenue 5-25 5.3.5i Landscape Cross Section: Haster Street 5-25 5.3.5j Landscape Cross Section: West Place 5-26 5.4.2.1a Gateway Location Plan 5-31 5.5a The Public Realm 5-38 5.5.2a West Street/Disneyland Drive Arrival Gateway 5-41 5.5.3.1a West Street/Disneyland Drive in the Public Realm 5-44 5.5.3.2a Harbor Boulevard in the Public Realm 5-45 5.5.3.3a Katella Avenue in the Public Realm (Interim Condition) 5-46 5.5.3.4a Disney Way west of Clementine Street in the Public Realm 5-47 5.5.3.5a Clementine Street in the Public Realm, Interim Condition without a Pedestrian and/or Transportation System(s) in Median 5-48 5.5.3.5b Clementine Street in the Public Realm, Ultimate Condition with a Pedestrian and/or Transportation System(s) in Median 5-48 5.5.3.6a Walnut Street in the Public Realm 5-49 5.5.3.7a Cerritos Avenue in the Public Realm 5-50 5.5.3.8a Ball Road (I-5 to West Place) in the Public Realm, with painted median 5-51 5.5.3.8b Ball Road (West Place to Walnut Street) in the Public Realm, with landscaped median 5-51 5.5.3.9a Haster Street in the Public Realm 5-52 5.6a The Setback Realm 5-53 5.6.1a Localize Lighting Effects 5-54 5.6.2a Landscaped Wall Identity Sign 5-55 5.6.3a Setback Adjacent to the New Theme Park: Katella Avenue (Ultimate Condition) 5- 56 5.6.3b Setback Adjacent to the New Theme Park on West Street/Disneyland Drive 5-57 5.6.4a Harbor Boulevard at Eastern Gateway, Bus and Shuttle Drop-off Area 5-58 5.6.6a West Street/Disneyland Drive Setbacks 5-59 5.6.7a Harbor Boulevard Setback adjacent to Existing Disneyland Theme Park 5-60 5.6.7b Harbor Boulevard north of Eastern Gateway 5-61 5.6.7c West Street/Disneyland Drive adjacent to Disneyland Theme Park Back-of-House 5-61 5.6.7d Ball Road adjacent to Disneyland Theme Park Back-of-House 5-62 5.6.7e Ball Road adjacent to Disneyland Administration Building 5-63 5.6.7f Rear Property lines adjacent to Anaheim Resort Uses 5-64 5.6.8.1a Typical West Parking Area Setback: Walnut Street 5-65 5.6.8.1b Typical East Parking Area Setback: Disney Way 5-66 ---PAGE BREAK--- The Disneyland Resort Specific Plan Section 9.0: Legal Description VIII 5.6.8.1c Typical East Parking Area Setback: Clementine Street and Manchester Avenue 5-66 5.6.8.1d Typical East Parking Area Setback: Katella Avenue (Interim Condition) 5-67 5.6.8.2a Walnut Street Parking Facility Setback 5-68 5.6.8.2b Katella Avenue Parking Facility Setback (Ultimate Condition) 5-68 5.6.9.4a Interior Setbacks adjacent to Residential Uses 5-70 5.6.10.3a Tree Density Factor Plan 5-72 5.6.10.4a Walnut Street Landscape at Installation 5-75 5.6.10.4b Walnut Street Landscape After Five Years 5-76 5.6.10.4c Walnut Street Landscape at Maturity (approximately 20 years after installation) 5-77 5.6.10.4d Perspective View of Walnut Street Landscape After Approximately 5-10 Years 5-78 5.7a The Private Realm 5-80 5.7.3.2a Harbor Boulevard: Theme Park Back-of-House Elevation 5-84 5.7.3.2b Katella Avenue: Theme Park Back-of-House 5-84 5.7.3.2c Harbor Boulevard showing potential treatment of theme park back-of-house building elevations 5-85 5.7.3.2d Harbor Boulevard showing potential treatment of theme park back-of-house building elevations 5-86 5.7.3.2e Katella Avenue showing potential treatment of theme park back-of-house building elevations 5-87 5.7.3.2f Katella Avenue showing potential treatment of theme park back-of-house building elevations 5-88 5.7.8.2a Typical Public Parking Structure Elevation, Parking District 5-97 5.7.8.2b Typical Public Parking Structure Elevation Showing Landscape in the Setback and Public Realm 5-98 5.7.8.2c Acoustical Louvers, West Parking Area Adjacent to Walnut Street 5-100 5.7.8.2d Public Parking Facility Layout 5-101 5.7.8.2e Public Parking Facility Openness 5-101 5.7.8.2f Employee Parking Layout 5-102 5.7.10.5a Wall Sign for Buildings Less Than Two Stories 5-110 5.7.10.5b Wall Sign for Buldings Greater Than Two Stories 5-111 5.7.10.5c Location of Building Address 5-112 5.7.10.6a Coordinated Sign System 5-113 5.7.70.6b Proper Sign Placement 5-113 5.7.10.7a Limit Area of Window Signs 5-114 5.8.1a Full Street Cross Section Reference Plan 5-121 5.8.1b A-A’: Harbor Boulevard 5-122 5.8.1c B-B’ Katella Avenue: Full Street Cross Section 5-123 5.8.1d C-C’ Walnut Street: Full Street Cross Section 5-124 5.8.1e D-D’ West Street/Disneyland Drive: Full Street Cross Section 5-125 5.8.1f E-E’ Ball Road: Full Street Cross Section 5-126 5.8.1g F-F’ Clementine Street and Manchester Avenue: Full Street Cross Section 5-127 5.8.1h G-G’ Disney Way: Full Street Cross Section 5-128 5.8.1i H-H’ Haster Street: Full Street Cross Section 5-129 5.8.1j I-I’ Cerritos Avenue Full Street Cross Section 5-130 5.8.1k J-J’ West Place Cul-de-Sac Full Street Cross Section 5-131 5.8.2a Half-Street Cross section Reference Plan 5-133 5.8.2b Half-Street Cross section 2-a, Katella Avenue 5-134 5.8.2c Half-Street Cross Section 2-b, Katella Avenue 5-135 5.8.2d Half-Street Cross Section 3-a, Katella Avenue 5-136 5.8.2e Half-Street Cross Section 3-b, Katella Avenue 5-137 5.8.2e(1) Half-Street Cross Section 3-c, Katella Avenue 5-138 5.8.2e(2) Half-Street Cross Section 3-d, Katella Avenue 5-139 ---PAGE BREAK--- IX 5.8.2f Half-Street Cross Section 4-a, Katella Avenue 5-140 5.8.2g Half-Street Cross Section 4-b, Katella Avenue 5-141 5.8.2h Half-Street Cross Section 5-a, Katella Avenue 5-142 5.8.2i Half-Street Cross Section 5-b, Katella Avenue 5-143 5.8.2j Half-Street Cross Section 6, Harbor Boulevard 5-144 5.8.2k Half-Street Cross Section 7, Harbor Boulevard 5-145 5.8.2l Half-Street Cross Section 8-a, Harbor Boulevard 5-146 5.8.2m Half-Street Cross Section 8-b, Harbor Boulevard 5-147 5.8.2n Half-Street Cross Section 8-c, Harbor Boulevard 5-148 5.8.2o Half-Street Cross Section 10-a, West Street/Disneyland Drive 5-149 5.8.2p Half-Street Cross Section 10-b, West Street/Disneyland Drive 5-150 5.8.2q Half-Street Cross Section 11, West Street/Disneyland Drive 5-151 5.8.2r Half-Street Cross Section 12, West Street/Disneyland Drive 5-152 5.8.2s Half-Street Cross Section 13, Katella Avenue 5-153 5.8.2t Half-Street Cross Section 14-a, West Street/Disneyland Drive 5-154 5.8.2u Half-Street Cross Section 10-b, West Street/Disneyland Drive 5-155 5.8.2v Half-Street Cross Section 15, Disney Way 5-156 5.8.2w Half-Street Cross Section 16, Disney Way 5-157 5.8.2x Half-Street Cross Section 17, Disney Way 5-158 5.8.2y Half-Street Cross Section 17-a, Harbor Boulevard 5-159 5.8.2z Half-Street Cross Section 17-b, Disney Way 5-160 5.8.2aa Half-street Cross Section 18, Interstate 5 5-161 5.8.2ab Half-Street Cross Section 18-a, Interstate 5 5-162 5.8.2ac Half-Street Cross Section 19, Walnut Street 5-163 5.8.2ad Half-Street Cross Section 20, Walnut Street 5-164 5.8.2ae Half-Street Cross Section 21, Walnut Street 5-165 5.8.2af Half-Street Cross Section 22, Haster Street 5-166 5.8.2ag Half-Street Cross Section 23, Ball Road 5-167 5.8.2ah Half-Street Cross Section 24, Ball Road 5-168 5.8.2ai Half-Street Cross Section 25, Cerritos Avenue 5-169 5.8.2aj Half-Street Cross Section 26, Cerritos Avenue 5-170 5.8.2ak Half-Street Cross Section 27, Clementine Street 5-171 5.8.2ak(1) Half-Street Cross Section 27-a, Disney Way 5-172 5.8.2al Cross Section 28, Interior Property Line Setback 5-173 5.8.2am Half-Street Cross Section 28-a, West Place Cul-de-Sac 5-174 5.8.2an Cross Section 29, Interior Property Adjacent to Residential 5-175 5.8.3a Theme Park District Concept Plan 5-177 5.8.3b Hotel District Concept Plan 5-178 5.8.3c Parking District Concept Plan: East Parking Area 5-179 5.8.3d Parking District Concept Plan: West Parking Area 5-180 5.8.3e Future Expansion District Concept Plan 5-181 5.8.3f Wall/Fencing Plan 5-182 5.8.4a Tree Selection Matrix 5-185 5.8.4b Shrub, Vine and Ground Cover Matrix 5-186 18.114.[PHONE REDACTED] Exhibit 7.0A General Sign Standard Matrix 7-59 18.114.[PHONE REDACTED] Exhibit 7.0B Motel/Hotel Sign Standards Matrix 7-64 10.1a Vicinity Map 10-3 10.2a City of Anaheim General Plan: Land Use Plan Existing Prior to Adoption of GPA No. 331 10-5 10.2b City of Anaheim General Plan: Amended Land Use Plan Per GPA No. 331 10-6 10.3a Anaheim General Plan: Circulation Element Existing Prior to Adoption of GPA No. 331 10-11 ---PAGE BREAK--- The Disneyland Resort Specific Plan Section 9.0: Legal Description X 10.3b City of Anaheim General Plan: Amended Circulation Element Per GPA No. 331 10-12 10.3c Exceptions List to Arterial Highway Rights-of-Way 10-15 Appendices a. The Disneyland Resort Specific Plan: Maximum Permitted Structural Height b. The Disneyland Resort Specific Plan: Development Plan c. The Disneyland Resort Specific Plan: Buildings to Remain d. The Disneyland Resort Specific Plan: Conditions of Approval e. The Disneyland Resort Specific Plan: Mitigation Monitoring Program f. Anaheim GardenWalk: Conditions of Approval g. Anaheim GardenWalk: Mitigation Monitoring Program