ALPINE COUNTY ADDENDUM #1 TO REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE HOT SPRINGS ROAD BRIDGE REPLACEMENT PROJECT JT Chevallier Community Development Director Alpine County 50 Diamond Valley Road Markleeville, CA 96120 [PHONE REDACTED] [EMAIL REDACTED] Original RFP Date Released: January 20, 2022 Addendum Date Released: February 02, 2022 ---PAGE BREAK--- Construction Management Services for Hot Springs Road Bridge Replacement Project 1 ADDENDUM #1 REQUEST FOR PROPOSALS TO CONSTRUCTION MANAGEMENT SERVICES FOR THE HOT SPRINGS ROAD PROJECT RELEASED: February 2, 2022 FINAL DEADLINE FOR QUESTIONS: Please submit questions to [EMAIL REDACTED] by 5 PM, Friday, February 4, 2022. SUBMITTAL REQUIREMENTS: Please electronically submit firm qualifications and cost proposals by e-mail separately to [EMAIL REDACTED] no later than 5 pm on February 15, 2022. Subject lines shall read: QUALIFICATIONS – CM RFP for Hot Springs Road Bridge Replacement Project BRLS-5931(030) and COST PROPOSAL – CM RFP for Hot Springs Road Bridge Replacement Project BRLS-5931(030). ADDENDUM ATTACHMENTS: 1. Attachment 1 — Existing Conditions photo 2. Attachment 2 — Removed (sample contract will be produced and agreed upon with the winning bidder) 3. Attachment 4 — Cost Proposal Exhibits 10-H1, 10-H2, & 10-H3 ---PAGE BREAK--- Attachment 1: Hot Springs Road Bridge — Existing Conditions Photo ---PAGE BREAK--- Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed ☐Prime Consultant ☐ Subconsultant ☐ 2nd Tier Subconsultant Consultant Project No. Contract No. Date DIRECT LABOR Classification/Title Name Hours Actual Hourly Rate Total LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) c) TOTAL DIRECT LABOR COSTS + INDIRECT COSTS d) Fringe Benefits (Rate: ) f) Overhead (Rate: ) e) Total Fringe Benefits x g) Overhead x h) General and Administrative (Rate: ) i) Gen & Admin x FIXED FEE j) TOTAL INDIRECT COSTS + + k) TOTAL FIXED FEE + x fixed fee ] l) CONSULTANT’S OTHER DIRECT COSTS (ODC) – ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit Unit Cost Total l) TOTAL OTHER DIRECT COSTS m) SUBCONSULTANTS’ COSTS (Add additional pages if necessary) Subconsultant 1: Subconsultant 2: Subconsultant 3: Subconsultant 4: m) TOTAL SUBCONSULTANTS’ COSTS n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS TOTAL COST + + + NOTES: 1. Key personnel must be marked with an asterisk and employees that are subject to prevailing wage requirements must be marked with two asterisks All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant’s annual accounting period and established by a cognizant agency or accepted by Caltrans. 3. Anticipated salary increases calculation (page 2) must accompany. Page 1 of 9 January 2020 Attachment 4 — Cost Proposal: Exhibits 10-H1, 10-H2, & 10-H3 Reset Form $ 0.00 $ 0.00 $ 0.00 0.00% $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 0.00% 0.00% $ 0.00 $ 0.00 0.00% Mileage Costs $ 0.00 Equipment Rental and Supplies $ 0.00 Permit Fees $ 0.00 Plan Sheets $ 0.00 Test $ 0.00 ---PAGE BREAK--- Local Assistance Procedures Manual EXHIBIT 1 0-H1 Cost Proposal EXHIBIT 10-H 1 COST PROPOSAL Page 2 of 3 COST-PLUS-FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Total Hours per Avg 5Year Subtotal per Cost Cost Proposal Hourly Contract Proposal Rate Duration = $250,000.00 500 $50.00 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation%) Avg Hourly Rate Proposed Escalation Year 1 $50.00 + 2% = $51.00 Year 2 Avg Hourly Rate Year 2 $51.00 + 2% = $52.02 Year 3 Avg Hourly Rate Year 3 $52.02 + 2% = $53.06 Year 4 Avg Hourly Rate Year 4 $53.06 + 2% = $54.12 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate% each year by total hours) Estimated % Completed Total Hours per Cost Total Hours per Each Year Proposal Year Year 1 20.0% 5000 = 1000 Estimated Hours Year 1 Year 2 400% 5000 = 2000 Estimated Hours Year 2 Year 3 15.0% 5000 = 750 Estimated Hours Year 3 Year 4 15.0% 5000 = 750 Estimated Hours Year 4 Years 100% 5000 = 500 Estimated Hours Year 5 Total 100% Total = 5000 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours Cost per (calculated above) (calculated above) Year Year 1 $50.00 1000 $50,000.00 Estimated Hours Year 1 = Year 2 $51.00 2000 $102,000.00 Estimated Hours Year 2 = Year 3 $52.02 750 $39,015.00 Estimated Hours Year 3 = Year 4 $53.06 750 $39,795.30 Estimated Hours Year 4 = Years $54.12 500 = $27,060.80 Estimated Hours Year 5 Total Direct Labor Cost with Escalation $257,871.10 = Direct Labor Subtotal before Escalation = $250,000.00 Estimated total of Direct Labor Salary Transfer to Page 1 = Increase $7,871.10 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the# of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the# of years is not acceptable. (i e. $250,000 x 2% x 5 yrs= $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Page 2 of 9 January 2020 ---PAGE BREAK--- _ Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-H 1 COST PROPOSAL Page 3 of 3 Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles {GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board {when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncom pliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate{s). Prime Consultant or Subconsultant Certifying: Name: _ Title*: Signature: _ _ _ _ _ _ _ _ _ Date of Certification {mm/dd/yyyy): _ Email: _ _ Phone Number: Address: _ *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providinq under the proposed contract: Page 3 of 9 January 2020 $ 0.00 SIGN ---PAGE BREAK--- Local Assistance Procedures Manual EXHIBIT 10-H2 Cost Proposal EXHIBIT 10-H2 COST PROPOSAL Page 1 of3 SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) Note: Mark-ups are Not Allowed Consultant _ D Prime Consultant D Subconsultant D 2nd Tier Subconsultant Project No. _ Contract No. - - - - - - Participation Amount $ _ Date - - For Combined Rate Fringe Benefit% + General &Administrative% = Combined ICR% OR For Home Office Rate Fringe Benefit % + General &Administrative% = Home Office ICR% For Field Office Rate Frinqe Benefit % + General &Administrative% = Field Office ICR% = Fee % BILLING INFORMATION CALCULATION INFORMATION Name/Job Title/Classification 1 Hourly Billing Rates2 Straight3 OT(1.5x) OT(2x) Effective Date of Hourly Rate From To Actual or Avg. Hourly Rate4 % or$ Increase Hourly Range for Classifications Only John Doe - Project Manager* Civil Engineer II $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 01/01/2016 01/01/2017 01/01/2018 12/31/2016 12/31/2017 12/31/2018 $0.00 $0.00 $0.00 0.0% 0.0% Not Applicable Sue Jones- Construction Engineeri1nspector Engineer I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 01/01/2016 01/01/2017 01/01/2018 12/31/2016 12/31/2017 12/31/2018 $0.00 $0.00 $0.00 0.0% 0.0% Not Applicable Buddy Black - Claims Engineer Engineer Ill Land Surveyor $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 01/01/2016 01/01/2017 01/01/2018 01/01/2016 01/01/2017 01/01/2018 12/31/2016 12/31/2017 12/31/2018 12/31/2016 12/31/2017 12/31/2018 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 0.0% 0.0% 0.0% 0.0% Not Applicable $00-$00 $00-$00 $00-$00 Technician $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 01/01/2016 01/01/2017 01/01/2018 12/31/2016 12/31/2017 12/31/2018 $0.00 $0.00 $0.00 0.0% 0.0% $00-$00 $00-$00 $00-$00 (Add pages as necessary) Page 4 of 9 January 2020 ---PAGE BREAK--- Local Assistance Procedures Manual EXHIBIT 10-H2 Cost Proposal NOTES: 1. Key personnel must be marked with an asterisk and employees that are subject to prevailing wage requirements must be marked with two asterisks costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. 3. Billing rate= actual hourly rate * (1 + ICR) * (1 + Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultants annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement. 4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification. EXHIBIT 10-H2 COST PROPOSAL Page2ot3 SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS) (CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS) Consultant _ □Prime Consultant □Subconsultant Project No. _ Contract No. Date _ SCHEDULE OF OTHER DIRECT COST ITEMS (Add additional pages as necessary) Description of Item Quantity Unit Unit Cost Total Subconsultant 1: Subconsultant 2: Subconsultant 3: Subconsultant 4: Subconsultant 5: Note: Add additional pages if necessary. NOTES: 1. List other direct cost items with estimated costs. These costs should be competitive in their respective industries and supported with appropriate documentation. 2. Proposed ODC items should be consistently billed regardless of client and contract type. 3. Items when incurred for the same purpose, in like circumstance, should not be included in any indirect cost pool or in the overhead rate. 4. Items such as special tooling, will be reimbursed at actual cost with supporting documentation (invoice). 5. Items listed above that would be considered "tools of the trade" are not reimbursable as other direct cost 6. Travel related costs should be pre-approved by the contracting agency and shall not exceed current State Department of Personnel Administration rules. Page 5 of 9 January 2020 Mileage Costs Vehicle Equipment Rental and Supplies Permit Fees Plan Sheets Test $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 $ 0.00 ---PAGE BREAK--- Local Assistance Procedures Manual EXHIBIT 10-H2 Cost Proposal 7. If mileage is claimed, the rate should be properly supported by the consultant's calculation of their actual costs for company vehicles. In addition, the miles claimed should be supported by mileage logs. 8. If a consultant proposes rental costs for a vehicle, the company must demonstrate that this is its standard procedure for all of their contracts and that they do not own any vehicles that could be used for the same purpose. 9. The cost proposal format shall not be amended. All costs must comply with the Federal cost principles. 10. Add additional pages if necessary. 11. Subconsultants must provide their own cost proposals. Page 6 of 9 January 2020 ---PAGE BREAK--- Local Assistance Procedures Manual EXHIBIT 10-H2 Cost Proposal EXHIBIT 10-H2 COST PROPOSAL Page 3 of 3 Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 7. Generally Accepted Accounting Principles (GAAP) 8. Terms and conditions of the contract 9. Title 23 United States Code Section 112 - Letting of Contracts 10. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 11. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service 12. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fair1y to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Prime Consultant or Subconsultant Certifying: Name: _ Title*: _ Signature: _ Date of Certification (mm/dd/yyyy): Email: _ Phone Number: _ Address: _ * An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: Page 7 of 9 January 2020 $ 0.00 SIGN ---PAGE BREAK--- Local Assistance Procedures Manual EXHBIT 10-H3 Cost Proposal EXHIBIT 10-HJ COST PROPOSAL Page 1 of 2 COST PER UNIT OF WORK CONTRACTS (GEOTECHNICAL AND MATERIAL TESTING) Note: Mark-ups are Not Allowed □Prime Consultant □Subconsultant □2nd Tier Subconsultant Consultant _ Project No. _ Contract No. Date - - - - - Unit/Item of Work: (Example: Log of Test Boring for Soils Report, or ADL Testing for Hazardous Waste Material Study} Include as many Items as necessary. DIRECT LABOR Hours Billing Hourly Rate Total{$) Professional {Classification)* Sub-professional/Technical** EQUIPMENT 1 {with Operator) EQUIPMENT 2 {with Operator) Consultant's Other Direct Costs (ODC)- Itemize: Description of Item Quantity Unit Unit Cost Total Subconsultant 1: Subconsultant 2: Subconsultant 3: Subconsultant 4: Subconsultant 5: Nole: Attach pages if necessary. TOTAL COST PER UNIT OF WORK NOTES: 1 . Key personnel must be marked with an asterisk and employees that are subject to prevailing wage requirements must be marked with two asterisks All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. The cost proposal format shall not be amended. 2. Hourly billing rates should include prevailing wage rates and be consistent with publicly advertised rates charged to all clients (Commercial, Private or Public). 3. Mobilization/De-mobilization is based on site location and number and frequency of tests/items. 4. ODC items shall be based on actual costs and supported by historical data and other documentation. 5. ODC items that would be considered "tools of the trade' are not reimbursable. 6. Billing Hourly Rates must be actual, allowable, and reasonable. Page 8 of 9 January 2020 Mileage Costs $ 0.00 Equipment Rental and Supplies $ 0.00 Permit Fees $ 0.00 Plan Sheets $ 0.00 Test $ 0.00 ---PAGE BREAK--- _ _ Local Assistance Procedures Manual EXHBIT 10-H3 Cost Proposal EXHIBIT 10-H3 COST PROPOSAL Page 2 of 2 Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal{s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 13. Generally Accepted Accounting Principles {GAAP) 14. Terms and conditions of the contract 15. Title 23 United States Code Section 112 - Letting of Contracts 16. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 17. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service 18. 48 Code of Federal Regulation Part 9904 - Cost Accounting Standards Board {when applicable) All costs must be applied consistently and fair1y to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Prime Consultant or Subconsultant Certifying: Name: _ Title*: _ Signature: _ Date of Certification {mm/dd/yyyy...._: _ _ _ _ _ Email: Phone Number,_,_: _ _ _ _ _ _ _ _ _ Address: _ * An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providinq under the proposed contract: Page 9 of 9 January 2020 $ 0.00 SIGN