← Back to Alpinecountyca Gov

Document alpinecountyca_gov_doc_1468097a28

Full Text

ALP 4 88 89 Alpine County Upgrade Bridge Rails and Markleeville Bridge Replacement Alpine County Virtual Open House June 23, 2020 Hosted by Brian Peters, Alpine County Community Development Director featuring Dan McElhinney, PE Caltrans District 10 District Director 1 ---PAGE BREAK--- Dan McElhinney DISTRICT DIRECTOR Grace Magsayo Deputy District Director PROGRAM, PROJECT AND ASSET MANAGEMENT Mimi Huie Project Manager PROGRAM, PROJECT AND ASSET MANAGEMENT Nomer Gutierrez Senior DESIGN Sheikh Alam Project Engineer DESIGN Kyle Hassell Transportation Engineer STRUCTURE DESIGN Jim Henke Senior ENVIRONMENTAL Scott Guidi Senior ENVIORNMENTAL Jonathan Coley Planner ENVIRONMENTAL Warren Alford PUBLIC INFORMATION OFFICER Ken Hass Semior STRUCTURE CONSTRUCTION Sam Wong Senior HYDRAULICS Don Rodgers Transportation Engineer HYDRAULICS P R O J E C T D E V E L O P M E N T T E A M Randip Bains Senior STRUCTURE DESIGN ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 PROJECT DESCRIPTION: Near Markleeville, on State Routes 4, 88 and 89 at various locations. Bridge rail upgrade on two bridges and one bridge replacement. PURPOSE: Replace the existing nonstandard bridge rails to current standards and replace one bridge. NEED: The bridges have rails that do not meet current design standards. 3 ---PAGE BREAK--- ALP 4 88 89 V I C I N I T Y M A P 1 0 - 0 x 7 5 0 2 ---PAGE BREAK--- P R O J E C T L O C A T I O N S ---PAGE BREAK--- LOCATION 1 ALP 88 PM 14.70 (Bridge # 31-0022) West Fork Carson River Bridge Upgrade Bridge Rail LOCATION 2 ALP 88 PM 16.22 (Bridge # 31-0005) West Fork Carson River Bridge Install Krail LOCATION 3 ALP 89 PM 14.69 (Bridge # 31-0002) Markleeville Creek Bridge Bridge Replacement LOCATION 4 ALP 4 PM 26.15 (Bridge # 31-0011) Silver Creek Bridge Upgrade Bridge Rail S C O P E O F W O R K ---PAGE BREAK--- ALP 4 88 89 • Replace with new, wider bridge to meet standard eight foot shoulders. • Scour mitigation will be placed along the south side of abutment 1 in the form of riprap. • Remove existing 8-inch culvert and replace in the southeast corner of the bridge. • Relocate and replace 24-inch culvert in the northwest corner of the bridge. • Both north and south bridge abutments are within the active creek channel; thus, requiring in-water work areas during in-water work window (June 1st to October 15th). • One lane traffic control during construction. One side of the bridge will be removed and reconstructed during the first stage, while the opposite side of the bridge will be removed and reconstructed during the second stage. S C O P E O F W O R K 1 0 - 0 x 7 5 0 MARKLEEVILLE BRIDGE Scope of Work 4 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 Photo: Google Earth View of Existing Topo and Markleeville Bridge Plan Overlay 7 ---PAGE BREAK--- ALP 4 88 89 P L A N D E T A I L S 1 0 - 0 x 7 5 0 8 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 Existing Bridge Length (ft) Width (ft) Bicyclist Pedestrian Existing Bridge 41’ – 4 ½” 28’ No No New Bridge 56’ – 6” 44’ - 4” Yes Yes 9 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 Existing Markleeville Bridge Artistic Rendering: Markleeville Bridge Replacement ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ALP 4 88 89 CALTRANS DISTRICT 10 10-0X750 Photo: Concrete Barrier Type 80 Bridge Railing Bridges in this project will be designed with the Concrete Barrier Type 80 with bike rail. (NOTE: Height is 42” to the top of the bike rail). Bridge rail will be revised to Concrete Barrier Type 85 with bike rail if approved before design is completed or revised as a Change Order during Construction. BRIDGE RAILS 10 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 Artistic Rendering: On Deck and Approach Views 11 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 Artistic Rendering: Community View of Markleeville Bridge Replacement after Completion of the Watershed Restoration Project 12 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 Artistic Rendering: Approach View of Widened Roadway, Shoulder and Upgraded Bridge Rail 13 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 Artistic Rendering: On Deck View 14 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ENVIRONMENTAL DOCUMENTS: CEQA • Initial Study with Mitigated Negative Declaration NEPA • Categorical Exclusion 5 ---PAGE BREAK--- ALP 4 88 89 Environmental processed an addendum to update project description to replace the Markleeville bridge. • Environmental impact area has not changed significantly. • Does not require public circulation. 10-0X750 6 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ALP 4 88 89 CALTRANS DISTRICT 10 10-0X750 Addendum to Categorical Exclusion/ Initial Study with Proposed Mitigated Negative Declaration 4 Website Access: ---PAGE BREAK--- Proposed Impacts and New Impact Area ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ALP 4 88 89 CALTRANS DISTRICT 10 10-0X750 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ALP 4 88 89 CALTRANS DISTRICT 10 10-0X750 ---PAGE BREAK--- T R A F F I C H A N D L I N G P L A N No Detour One-Way Traffic Control Temporary Traffic Signals LOCATION 3: Markleeville Creek Bridge ---PAGE BREAK--- ---PAGE BREAK--- LOCATION #1 (ALP 88 PM 14.70 – West Fork Carson River Bridge) ---PAGE BREAK--- LOCATION #1 (ALP 88 PM 14.70 – West Fork Carson River Bridge) ---PAGE BREAK--- LOCATION #3 (ALP 89 PM 14.69 – Markleeville Creek Bridge) ---PAGE BREAK--- LOCATION #3 (ALP 89 PM 14.69 – Markleeville Creek Bridge) ---PAGE BREAK--- LOCATION #4 (ALP 4 PM 26.15 – Silver Creek Bridge) ---PAGE BREAK--- LOCATION #4 (ALP 4 PM 26.15 – Silver Creek Bridge) ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ALP 4 88 89 CALTRANS DISTRICT 10 10-0X750 MILESTONE DESCRIPTION DATE BEGIN DESIGN 2/26/19 R/W CERTIFICATION 4/23/19 ENVIRONMENTAL CERTIFICATION 6/29/20 READY TO LIST 6/29/20 HQ ADVERTISE 1/15/20 AWARD 3/5/21 APPROVE CONTRACT 3/19/21 CONTRACT ACCEPT 7/20/23 PROJECT SCHEDULE 15 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ALP 4 88 89 CALTRANS DISTRICT 10 10-0X750 TOTAL COST (UPGRADE BRIDGE RAILS ON THREE BRIDGES AND ONE BRIDGE REPLACEMENT) COST SUPPORT (DESIGN, ENVIRONMENTAL, RIGHT OF WAY, CONSTRUCTION) 5,631 CAPITAL (RIGHT OF WAY, CONSTRUCTION) 7,830 TOTAL PROJECT COST 13,524 PROGRAMMED PROJECT COST 16 ---PAGE BREAK--- CALTRANS DISTRICT 10 10-0X750 ALP 4 88 89 ACTIVE AND CLOSEOUT PROJECTS IN ALPINE COUNTY STATE HIGHWAY OPERATION PROTECTION PROGRAM (SHOPP) HIGHWAY MAINTENANCE ---PAGE BREAK--- ---PAGE BREAK--- ---PAGE BREAK--- ALP 4 88 89 Alpine County Virtual Open House June 23, 2020 Alpine County 10-0X750 Upgrade Bridge Rails and Markleeville Bridge Replacement 17