← Back to Albany, NY

Document Albany_doc_310253f9fe

Full Text

A Guidance Document for MS4s Traditional Land Use Control MS4s (SPDES MS4 Permit No.): City of Albany (NYR20A464); Town of Bethlehem (NYR20A208); City of Cohoes (NYR20A243); Town of Colonie (NYR20A190); Village of Colonie (NYR20A076); Village of Green Island (NYR20A377); Town of Guilderland (NYR20A211); Village of Menands (NYR20A144); Town of New Scotland (NYR20A463); City of Watervliet (NYR20A087). Traditional Non Land Use Control MS4: Albany County (NYR20A359). Non-Traditional MS4: University at Albany- SUNY (NYR20A234). Stormwater Coalition of Albany County Oversight of the NYSDEC Construction Activity Permit SPDES General Permit No. GP-0-15-002 ; Stormwater Coalition of Albany County Members Oversight Forms for MS4s (Release Date: March 23, 2016) Content Check Lists and Other Stormwater Practitoners 175 Green Street, Room B042, Albany, NY 12202 [PHONE REDACTED] [PHONE REDACTED] (fax) www.stormwateralbanycounty.org [EMAIL REDACTED] ---PAGE BREAK--- John Dzialo Town of Colonie Traditional Land Use Control MS4 Maryella Davenport, CPESC City of Albany, Albany Water Board* Traditional Land Use Control MS4 David Dressel City of Watervliet* Traditonal Land Use Control MS4 David Kubek, CPESC, Albany County Traditional Non Land Use Control MS4 Frank Fazio, PE University at Albany-SUNY Non-Traditional MS4 Nancy Heinzen Stormwater Coalition of Albany County If you have suggestions for improving this document and related forms and check lists, go the Stormwater Coalition of Albany County website (http://www.stormwateralbanycounty.org/) and submit your comments using the Public Comment portal. Thank you! ACKNOWLEDGMENTS Forms Committee This Guidance Document was developed by the Forms Committee of the Stormwater Coalition of Albany County. The collective experience of Committee participants includes design; review; site inspections during construction; developing and implementing maintenance agreements; and inspection of post construction stormwater practices. Together the Committee represents a wide variety of MS4/municipal types, with two of the MS4 municipalities also responsible for a Combined Sewer Overflow (CSO) SPDES Permit and the related Albany Pool Long Term Control Plan The content of this document reflects the experience of several MS4s audited by the Federal Environmental Protection Agency (EPA) over the past 3 years. Stormwater Coalition of Albany County Guidance Document ---PAGE BREAK--- Description of the document, it's purpose, organization, and suggestions for use by MS4 staff, preparers and reviewers p.1 Part I A. Basic Project Information Place to record basic information used to identify the p.2 B. Permit Coverage Information Place to track construction activity permit coverage over time; related changes in ownership; permitted land area; status of coverage p.2 C. Contact Information Place to record contact information pertaining to all individuals involved with the Construction Activity permit (Owner operator; preparer/reviewers/inspectors; MS4 consultants/staff) p.3 D. Reviewers Place to identify all reviewers; submission dates; status of inter-MS4, stakeholder reviews p.8 E. Comments and Corrections Place for reviewers and MS4s to identify and communicate missing components and status of corrections p.10 F. Other Municipal Documents Place for MS4s to communicate internally the status of municipal permits/documents related to land disturbance and associated development (building permits, fees, escrow accounts, maintenance agreements, deeds, etc.) p.12 G. Critical Information Summary - From - From MS4 Summary of key project information from and/or from MS4. Information is used to determine type and necessary design features given site. p.18 Part II A. Project Parameters Project location; site regulatory features; local laws; policy documents; physical geography; eligibility for construction activity permit coverage; project type (E/SC only, E/SC-Post Cons) p.2 B. Forms and Documents Forms and documentation to submit with p.6 C. Erosion and Sediment Control Components Required content named in Construction Activity Permit GP-0-15-002 and by request from MS4s p.10 D. Post Construction Stormwater Management Components Required content named in Construction Activity Permit GP-0-15-002; the NYS Stormwater Management Design Manual (2015); and by request from MS4s p.17 E. Municipal Requirements-Maps, Construction Drawings, Standards Requirements developed by MS4s to help standardize submissions, clarify MS4 expectations, and visualize all phases of the construction project p.31 Part III A. Project Parameters Same content as Part II.A. (Numbering of line items is the same as Part II. Content Check List. Where appropriate, content has been abbreviated. p.2 B. Forms and Documents Same content as Part II.B. (see above) p.4 C. Erosion and Sediment Control Components Same content as Part II.C. (see above) p.5 D. Post Construction Stormwater Management Components Same content as Part II.D. (see above) p.10 E. Municipal Requirements-Maps, Construction Drawings, Standards Same content as Part II.E. (see above) p.19 Table of Contents Guidance Document Explained and Instructions Part I. Oversight Forms for MS4s Part II. Content Check List - Long Version Part III. Content Check List - Short Version Stormwater Coalition of Albany County Guidance Document ---PAGE BREAK--- Oversight of the Construction Activity Permit Guidance Document Explained & Instructions Purpose The purpose of this document is to help public entities regulated under the Federal Clean Water Act MS4 Permit, as administered by the New York State Department of Environmental Conservation (NYSDEC), better manage their oversight of the NYSDEC Construction Activity General Permit. It functions as a teaching tool to help explain what should be included in a Construction Activity Storm Water Pollution Prevention Plan and as a compendium of forms to help MS4s manage the review process and track content. The “forms” presented here were created using Microsoft EXCEL and are available in two formats; as a PDF which includes all forms organized by topic as described in the Table of Contents and as an EXCEL workbook easily adapted to individual MS4 needs and interests. While the document in total was created by the Stormwater Coalition of Albany County, how individual MS4s choose to use it is at the discretion of the MS4. Specific MS4 instructions can be noted below. In general the intent of this Guidance Document is to establish expectations beneficial to all involved with preparing, reviewing, and implementing Part I. Oversight Tools for MS4s This includes a set of forms intended to help MS4s track who is responsible for what regarding the review process; the status of corrections and modifications of the status of construction activity permit coverage over time; the status of internal municipal documents related to land disturbance permitting; and the status of long term maintenance agreements pertaining to post construction stormwater management practices. The Part I. G. Critical Information Summary form is used to record key information about the proposed Part II. and Part III. Content Check Lists – Long and Short Versions These Content Check Lists, both the Long and Short Versions are a comprehensive list of items to include in a They are broken out into topics, each with a specific purpose. Section A. Project Parameters. Information establishes the type of to be prepared, regulatory/MS4 requirements, site geography. Section B. Forms and Documents. Lists all forms and documents to include with the Section C. Erosion and Sediment Control Components. Reviewers and Preparers are reminded of required elements named in the NYSDEC Construction Activity Permit GP-0-15-002; MS4s clarify requirements and note additonal requests. Section D. Post Construction Stormwater Management Components. Reviewers and Preparers are reminded of required elements named in the NYSDEC Construction Activity Permit GP-0-15-002 and NYSDEC Stormwater Management Design Manual (2015); MS4s clarify requirements and note additional requests. Section E. Municipal Requirements. Listing of municipal requirements pertaining to drawings, maps, and rainfall standards. The Long Version is highly descriptive of permit and municipal requirements. This is intentional. The language is there to help explain the content of a and serve as guidance for individuals less familiar with requirements. The Short Version is an abbreviated listing of requirements intended to remind experienced Preparers and Reviewers of requirements. Individuals new to preparation or review may want to use the Long Version Check List, while others more familiar with may want to use it for reference. Both versions use the same number to reference the same check list item. If using the Short Version, that number will refer back to the Long Version where there is a more detailed description. Some items have been removed from the Short Version. This explains gaps in the Short Version numbering system. Using the Content Check Lists. In the Preparer column, the Preparer notes if the item is present, not applicable, and records where the item is located by page number in the In the Reviewer column, MS4 staff and/or a consultants hired by the MS4 check the content of the against the Preparer's information. Items missing from the or in need of clarification can then be recorded by the Reviewer in the Part I. Oversight Forms for MS4s - E. Comments and Corrections form, tracked by item number and shared with others Preparer, Reviewer(s), municipal staff), as needed. HOW TO USE THESE FORMS & CHECK LISTS: MS4 INSTRUCTIONS TO Preparers and/or Reviewers Stormwater Coalition of Albany County Guidance Document Instructions: 1 of 1 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part I A. Basic Project Information Place to record basic information used to identify the p.2 B. Permit Coverage Information Place to track construction activity permit coverage over time; related changes in ownership; permitted land area; status of coverage p.2 C. Contact Information Place to record contact information pertaining to all individuals involved with the Construction Activity permit (Owner operator; preparer/reviewers/inspectors; MS4 consultants/staff) p.3 D. Reviewers Place to identify all reviewers; submission dates; status of inter-MS4, stakeholder reviews p.8 E. Comments and Corrections Place for reviewers and MS4s to identify and communicate missing components and status of corrections p.10 F. Other Municipal Documents Place for MS4s to communicate internally the status of municipal permits/documents related to land disturbance and associated development (building permits, fees, escrow accounts, maintenance agreements, deeds, etc.) p.12 G. Critical Information Summary - From - From MS4 Summary of key project information from and/or from MS4. Information is used to determine type and necessary design features given site. p. 18 CONTENT Part I. Oversight Forms for MS4s Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 1 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Activity Part I. Oversight Forms for MS4s A. Basic Project Info B. Permit Coverage Date: A. Basic Project Information Date SPDES Coverage Terminated (date stamp of Ack. Letter from NYSDEC): Continuing Owner or Operator/Existing SPDES Permit No. New Owner-Operator or Owner-Operator(s) if land area sub-divided. New SPDES Permit No. Date SPDES Coverage Authorized (date stamp of Acknowledgment Letter from NYSDEC) Date SPDES Coverage Terminated (date stamp of of Acknowledement Letter from NYSDEC) Part I. Oversight Forms for MS4s A. Basic Project Information B. Permit Coverage Information Project Name: Project Owner or Operator: # of Acres To Be Disturbed: If project receives Construction Activity permit coverage… MS4 Official who signed Notice of Termination Form/Date MS4 Official signed form: For projects which required review by Town, Village or City... Directions from Construction Activity Permit GP-0-15-002, pg. 17: "If there is a change in operational control over the construction plans and specification, the original owner or operator must notify the new owner or operator, in writing of the requirement to obtain permit coverage by submitting a Notice of Intent (NOI) with the Department (NYSDEC). Once the new owner or operator obtains permit coverage, the original owner or operator shall then submit a completed Notice of Termination with the name and permit identification number of the new owner or operator to the Department at the address in Part II.A.1 of this permit. If the original owner or operator maintains ownership of a portion of the constuction activity and will disturb soil, they must maintain coverage undet the permit." Site Address: Location of Project (name of municipalit(ies); nearest cross streets) If project requires review by an MS4, name of MS4/municipality: Project identifier used by MS4 to manage project, if available (GIS ID number; spreadsheet ID, etc.): SPDES MS4 Permit No. of MS4/Municipality: Date Project Submitted For Review: Construction SPDES Permit No: Date SPDES Coverage Authorized (date stamp of Acknowledgment Letter from NYSDEC): When project ownership changes… B. Permit Coverage Information (For MS4 Staff) MS4 Official who signed MS4 Acceptance Form/Date MS4 Official signed form: Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 2 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part 1. Oversight Forms for MS4s C. Contact Information Project: First Name: Last Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: First Name: Last Name: Company Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: Name of Company: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: Part I. Oversight Forms for MS4s C. Contact Information 1. Owner Operator Information a. Project Owner or Operator (Applicant) c. Preparer (Company) b. Project Engineer (All Aspects of Project) TYPICAL FOR LARGE PROJECTS Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 3 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part 1. Oversight Forms for MS4s C. Contact Information Project: Part I. Oversight Forms for MS4s C. Contact Information First Name: Last Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: Name of Qualified Professional : Credentials of Qualified Professional : Role of Qualified Professional (circle one): Prepare Supervises Preparer First Name: Last Name: Company Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: Control (CPESC); Trained Contractor w/4 Hr E/SC training working under direct supervision of PE or RLA. Control (CPESC); Trained Contractor w/4 Hr E/SC; Other (describe) *See criteria for needing a Qualified Inspector in Part IV.C.1. of GP-0-15-002 (pg. 25) e. Inspector for Owner or Operator (Individual) - ANTICIPATED If requires Qualified Inspector*, Qualified Inspector credentials (circle all that apply): Professional Engineer (PE); Registered Landscape Architect (RLA); Certified Professional in Erosion and Sediment If Trained Contractor, name of supervising PE or RLA: If does NOT require Qualified Inspector, Inspector credentials (circle all that apply): d. Preparer (Individual) Preparer Credentials (circle all that apply): Professional Engineer (PE); Registered Landscape Architect (RLA); Certified Professional in Erosion and Sediment Control (CPESC) If Includes Post Construction Practices: Professional Engineer (PE); Registered Landscape Architect (RLA); Certified Professional in Erosion and Sediment Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 4 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part 1. Oversight Forms for MS4s C. Contact Information Project: Part I. Oversight Forms for MS4s C. Contact Information Role (circle all that apply): Consultant Hired By MS4; MS4 Staff Person Other Interested Party (circle all that apply): County 239 Review; Other Stakeholder (MS4); Other First Name: Last Name: Company Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: First Name: Last Name: Company Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: Other (describe) b. Reviewer (Individual) - ADDITIONAL (RLA); Certified Professional in Erosion and Sediment Control (CPESC); Trained Contractor (4 Hr E/SC Training); Other (describe) Reviewer Credentials (circle all that apply): Professional Engineer (PE); Registered Landscape Architect Role (circle all that apply): Consultant Hired By MS4; MS4 Staff Person Other Interested Party (circle all that apply): County 239 Review; Other Stakeholder (MS4); Other 2. MS4 Oversight of Construction Activity Permit Reviewer credentials (circle all that apply): Professional Engineer (PE); Registered Landscape Architect a. Reviewer (Individual) (RLA); Certified Professional in Erosion & Sediment Control (CPESC); Trained Contractor (4 Hr E/SC Training); Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 5 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part 1. Oversight Forms for MS4s C. Contact Information Project: Part I. Oversight Forms for MS4s C. Contact Information Role (circle all that apply): Stormwater Program Coordinator; Stormwater Management Officer Other (describe) First Name: Last Name: Company Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: First Name: Last Name: Company/Institution Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: d. Inspector for MS4 (Individual) - ANTICIPATED c. MS4 Stormwater Program Staff Person (Individual) Certified Professional in Erosion and Sediment Control (CPESC); Trained Contractor (4 Hr E/SC Training); MS4 Staff Credentials (circle all that apply): Professional Engineer (PE); Registered Landscape Architect (RLA) Code Enforcement Officer (CEO); Other (describe) Training); Code Enforcement Officer (CEO); Other (describe) Role (circle all that apply): Consultant Hired By MS4; MS4 Staff Person; SWCD Staff; Others (describe) MS4 Inspector Credentials (circle all that apply): Professional Engineer (PE); Registered Landscape Architect (RLA); Certified Professional in Erosion and Sediment Control (CPESC); Trained Contractor (4 Hr E/SC Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 6 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part 1. Oversight Forms for MS4s C. Contact Information Project: Part I. Oversight Forms for MS4s C. Contact Information First Name: Last Name: Mailing Address Street: Street: City, State, Zip Code: Phone Number: Email: MS4 Name: Certified Professional in Erosion and Sediment Control (CPESC); Registered Landscape Architect (RLA); Trained Contractor (4 Hr E/SC Training); Code Enforcement Officer (CEO); Other (describe) Management Officer Credentials (circle all that apply): Professional Engineer (PE); e. Enforcement - SW Management Officer for MS4 (Individual) - ANTICIPATED Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 7 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s D. Reviewers If others review name of individual from MS4 responsible for coordinating internal review: Date first provided to others for review: If Yes, name of Individual who received the for review: Name of consulting firm and/or individual who prepared Are reviewed by others from MS4, Y/N? Part I. Oversight Forms for MS4s D. Reviewers If Yes, name of Individual who received the for review: Name of Individual from MS4 Responsible for Coordinating review: a. MS4 owns property, but as a Traditional MS4 w/ No Land Use Control (County) or Non Traditional MS4 (Public University), procedures exist to ensure MS4 Permit compliant oversight of the Construction Activty. MS4 Acceptance Form is not required. Date first provided to others for review: Are reviewed by others from MS4, Y/N? (If unclear, see County or Public University procedures) If others review name of individual from MS4 responsible for coordinating internal review: 1. MS4 is not the owner or operator of the project, but as a Traditional MS4 w/Land Use Control (Town, Village, City), the MS4 oversees the Construction Activity Permit. MS4 Acceptance Form is required and is submitted by the developer with the Construction Activity Permit Notice of Intent. Date of Submission: Name of Company and/or Individual submitting the for review by a Traditional Land Use Control MS4: 2. MS4 is the owner or operator of project Name of consulting firm and/or individual who prepared Name of Individual from MS4 who received b. MS4 owns property. review, approval, and inspection requirements are embedded in procedures for municipal owned projects. MS4 Acceptance Form is not required. Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 8 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s D. Reviewers Part I. Oversight Forms for MS4s D. Reviewers a. Name of Institution/Stakeholder Contact Name Comments Actions Taken Email Phone b. Name of Institution/Stakeholder Contact Name Comments Actions Taken Email Phone b. Name of Institution/Stakeholder Contact Name Comments Actions Taken Email Phone c. Name of Institution/Stakeholder Contact Name Comments Actions Taken Email Phone Does this project potentially impact County infrastructure, other MS4/municipalities, or other stakeholders, Y/N? If Yes, list of others to review contact information, comments, and actions taken. 3. Other Reviewers (County, Other Stakeholders) Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 9 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s E. Comments and Corrections Date Issues By Item & Page Number Comments Corrected, Y/N? (For Item/Pg see Part II & III Ck Lists) Date Issues By Item & Page Number Comments Corrected, Y/N? (For Item/Pg see Part II & III Ck Lists) 1. First Submission for Review Name/Title of Reviewer: 2. Second Submission for Review Part I. Oversight Forms for MS4s E. Comments and Corrections Name/Title of Reviewer: Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 10 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s E. Comments and Corrections Part I. Oversight Forms for MS4s E. Comments and Corrections Date Issues By Item & Page Number Comments Corrected, Y/N? (For Item/Pg see Part II & III Ck Lists) Date Issues By Item & Page Number Comments Corrected, Y/N? (For Item/Pg see Part II & III Ck Lists) Name/Title of Reviewer: 3. Third Submission for Review Name/Title of Reviewer: 4. Fourth Submission for Review Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 11 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s F. Other Municipal Documents Date: NA Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal NA Bldg Dept SW Prog Coor Chief Exec, Legal Stormwater NYSDEC SPDES Permits Construction Activity Permit MS4 Acceptance Form Notice of Termination Form (signed by MS4) Multi -Sector General Permit Municipal Permits Building Permit Grading Permit Part I. Oversight Forms for MS4s F. Other Municipal Documents Permit Issued By Whom, Date Permit Terminated By Whom, Date Doc Final-Executed-Issued By Whom, Date Description Doc Final- Executed- Issued (Date?) Doc- Application- Fees Submtted to MS4 (Date?) Pmt Rec'd (Date?) NA MS4/Municipal Oversight Name of MS4/Municipality: *SPDES Permit coverage is required BEFORE land disturbance can begin. List of Documents Informed By MS4 That Document, Permit, Fees Required (Date?) Owner or operator Construction Activity Permit No.: Date SPDES Permit Issued*: Doc-App-Fees Rec'd By MS4 By Whom, Date MS4 Informs Owner Operator Of Required Documents, Permits, Fees (Date?) Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 12 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s F. Other Municipal Documents Date: NA Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal NA Bldg Dept SW Prog Coor Chief Exec, Legal Part I. Oversight Forms for MS4s F. Other Municipal Documents Permit Issued By Whom, Date Permit Terminated By Whom, Date Doc Final-Executed-Issued By Whom, Date Description Doc Final- Executed- Issued (Date?) Doc- Application- Fees Submtted to MS4 (Date?) Pmt Rec'd (Date?) NA MS4/Municipal Oversight Name of MS4/Municipality: *SPDES Permit coverage is required BEFORE land disturbance can begin. List of Documents Informed By MS4 That Document, Permit, Fees Required (Date?) Owner or operator Construction Activity Permit No.: Date SPDES Permit Issued*: Doc-App-Fees Rec'd By MS4 By Whom, Date MS4 Informs Owner Operator Of Required Documents, Permits, Fees (Date?) Clearing Permit Clearing & Grading Permit Demolition Permit Highway Work Permit (Municipal) Utility Permit (Water Supply) Utility Permit (Sanitary) Utility Permits (Storm) Watercourses and Flood Plain Permit Street Opening Permit Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 13 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s F. Other Municipal Documents Date: NA Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal NA Bldg Dept SW Prog Coor Chief Exec, Legal Part I. Oversight Forms for MS4s F. Other Municipal Documents Permit Issued By Whom, Date Permit Terminated By Whom, Date Doc Final-Executed-Issued By Whom, Date Description Doc Final- Executed- Issued (Date?) Doc- Application- Fees Submtted to MS4 (Date?) Pmt Rec'd (Date?) NA MS4/Municipal Oversight Name of MS4/Municipality: *SPDES Permit coverage is required BEFORE land disturbance can begin. List of Documents Informed By MS4 That Document, Permit, Fees Required (Date?) Owner or operator Construction Activity Permit No.: Date SPDES Permit Issued*: Doc-App-Fees Rec'd By MS4 By Whom, Date MS4 Informs Owner Operator Of Required Documents, Permits, Fees (Date?) Other Documents (Not Permits) Escrow account Deed Stormwater Maintenance Agreement Certificate of Occupancy NFIP Elevation Certificate Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 14 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s F. Other Municipal Documents Date: NA Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal NA Bldg Dept SW Prog Coor Chief Exec, Legal Part I. Oversight Forms for MS4s F. Other Municipal Documents Permit Issued By Whom, Date Permit Terminated By Whom, Date Doc Final-Executed-Issued By Whom, Date Description Doc Final- Executed- Issued (Date?) Doc- Application- Fees Submtted to MS4 (Date?) Pmt Rec'd (Date?) NA MS4/Municipal Oversight Name of MS4/Municipality: *SPDES Permit coverage is required BEFORE land disturbance can begin. List of Documents Informed By MS4 That Document, Permit, Fees Required (Date?) Owner or operator Construction Activity Permit No.: Date SPDES Permit Issued*: Doc-App-Fees Rec'd By MS4 By Whom, Date MS4 Informs Owner Operator Of Required Documents, Permits, Fees (Date?) Municipal Fees Permit Applications Building Demolition, Clearing, or Grading Watercourses and Flood Plain Land Use Review Fees Commercial Site Review Fee Residential Subdivisions Commercial Subdivision Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 15 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s F. Other Municipal Documents Date: NA Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal NA Bldg Dept SW Prog Coor Chief Exec, Legal Part I. Oversight Forms for MS4s F. Other Municipal Documents Permit Issued By Whom, Date Permit Terminated By Whom, Date Doc Final-Executed-Issued By Whom, Date Description Doc Final- Executed- Issued (Date?) Doc- Application- Fees Submtted to MS4 (Date?) Pmt Rec'd (Date?) NA MS4/Municipal Oversight Name of MS4/Municipality: *SPDES Permit coverage is required BEFORE land disturbance can begin. List of Documents Informed By MS4 That Document, Permit, Fees Required (Date?) Owner or operator Construction Activity Permit No.: Date SPDES Permit Issued*: Doc-App-Fees Rec'd By MS4 By Whom, Date MS4 Informs Owner Operator Of Required Documents, Permits, Fees (Date?) Highway and Utility Extension Fee SEQR Review Rezoning Review Watercourses and Flood Plain Application Fees Open Development Review Fee Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 16 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s F. Other Municipal Documents Date: NA Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal Bldg Dept SW Prog Coor Chief Exec, Legal NA Bldg Dept SW Prog Coor Chief Exec, Legal Part I. Oversight Forms for MS4s F. Other Municipal Documents Permit Issued By Whom, Date Permit Terminated By Whom, Date Doc Final-Executed-Issued By Whom, Date Description Doc Final- Executed- Issued (Date?) Doc- Application- Fees Submtted to MS4 (Date?) Pmt Rec'd (Date?) NA MS4/Municipal Oversight Name of MS4/Municipality: *SPDES Permit coverage is required BEFORE land disturbance can begin. List of Documents Informed By MS4 That Document, Permit, Fees Required (Date?) Owner or operator Construction Activity Permit No.: Date SPDES Permit Issued*: Doc-App-Fees Rec'd By MS4 By Whom, Date MS4 Informs Owner Operator Of Required Documents, Permits, Fees (Date?) Other Fees Development Activity Fee Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 17 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s G. Critical Info Summary - From - From MS4 Project:    5. Site Disturbance Total site area Total disturbed area (total disturbance includes entire common plan of development) Total area not disturbed I. Oversight Forms for MS4s G. Critical Information Summary - From - From MS4 Check All That Apply; Provide Info Where Indicated) 1. Project Owner MS4/Municipality Project NOT owned by MS4, but is located in an MS4 municipality with land use control (town-village-city) Project NOT owned by MS4, NOT located in an MS4 municipality a. Local Law by number and date which authorizes oversight of Construction Activity Permit by MS4 of this project b. Land disturbance threshold (acres and/or square feet) adopted by MS4 and included in local law which triggers ovesight of land disturbance activity c. Municipal laws-codes-ordinances adopted by MS4 to support use of green infrastructure practices and remove obstacles for developers 2. Private Developer Projects Reviewed by MS4 2.a. 2.b. d. Policies adopted by MS4 to encourage use of green infrastructure practices and remove obstacles for developers e. If MS4 owns storm water infrastructure which discharges to an impaired waterbody segment listed n Appendix 2 of the MS4 permit, there may be additional MS4 requirements related to stormwater management practices design. Describe these requirements. 3. Municipal Permits; Other Public Entity Permits Policy Documents a. Permits owner-operator must obtain before land disturbance can begin (ex. Building; Grading; Clearing; Grubbing; Demolition; Land Development Activity Permit; Other) b. Policy and/or procedures document developed by MS4 for MS4 owned construction projects intended to support use of green infrastructure and encourage better management of construction activity 4. Municipalities with CSO and MS4 SPDES Permits a. Albany Pool CSO LTCP Plan Consent Order requirements which impact design of stormwater practices in areas with storm system infrastructure (construction activity may discharge to storm only and/or combined storm- sanitary infrastructure) Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 18 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s G. Critical Info Summary - From - From MS4 Project: I. Oversight Forms for MS4s G. Critical Information Summary - From - From MS4 Check All That Apply; Provide Info Where Indicated)  Erosion and Sediment Controls Only (formerly refered to as "BASIC" Why E-SC only project? List relevant Construction Activity Permit Appendix B Table 1 Activity. Include all that apply.  Erosion and Sediment Controls AND Post Construction Stormwater Management Practices (formerly refered to as "FULL" Why E-SC with post-construction practices project? List relevant Construction Activity Permit Appendix B Table 2 Activity. Include all that                       Redevelopment Activity Y, Ann Lee (Shakers) Pond, Stump Pond a. Stream classification of receiving water i. Receiving water is an impaired 303 segment listed in Appendix E of Contruction Activity Permit, Y/N? Y, Basic Creek Reservoir No 8. Receiving Waters of Construction Activity discharges Class C or Class C (TS) "Trout waters" New Development in Enhanced Phosphorus Removal Watershed 7. Project Activity Type (Post Construction Stormwater Practices) 6. Project Type Redevelopment Activity and New Development New Development Y. Ann Lee (Shakers) Pond, Stump Pond. Primary Pollutand of Concern: Phosphorus Y. Basic Creek reservoir. Primary Pollutand of Concern: Phosphorus No ii. Receiving water is an impaired 303 segment listed in Appendix 2 of MS4 Permit Class AA or AA-s; and b "Drinking water" Other b. Regulatory status Y. Name of Fifth order (Cpv doesn't apply) No First order Second order Third order Fourth order ii. Receiving water is an impaired 303 segment iii. Stream order of initial receiving water (from dataset) Yes, discharges to tidal water (Cpv doesn't apply) No, does NOT discharge to tidal water d. Does site discharges directly to tidal water? Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 19 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s G. Critical Info Summary - From - From MS4 Project: I. Oversight Forms for MS4s G. Critical Information Summary - From - From MS4 Check All That Apply; Provide Info Where Indicated)         HSG A  HSG B  HSG C  HSG D  HSG A/D*  HSG B/D*  HSG C/D*         b. Soil erodibility c. Karst topography d. Slopes a. Hydrological soil groups (HSG) present at site Highly erodible soils present Karst bedrock present Combined sanitary/storm system owned by municipalty with MS4 & CSO Permit. Early stages of project, discharges may go to a combined sanitary/storm system; by the end of the project, discharges to a separated system. a. If Construction Activity Permit discharges are conveyed to another storm system, who owns that system? Public storm system, owned by MS4. Name of MS4(s): Slopes between 0% and 15% Private owner 9. Storm system infrastructure Public storm system, owned by MS4. Name of MS4(s): Publically owned system, not an MS4. Name of owner: b. If area of the construction activity receives stormwater runoff, who owns the sending storm system? Publically owned system, not an MS4. Name of owner: Private owner 10. Site Conditions Moderately erodible soils present *first letter drained conditions/second letter undrained conditions Minimal erodible soils present Construction activity where map unit Soil Slope Phase identified as E or F (USDA Soil Survey for Albany County) and no existing impervious cover Construction activity where map unit is inclusive of 25% or greater slope (USDA Soil Survey for Albany County) Karst bedrock NOT present Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 20 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part I. Oversight Forms for MS4s G. Critical Info Summary - From - From MS4 Project: I. Oversight Forms for MS4s G. Critical Information Summary - From - From MS4 Check All That Apply; Provide Info Where Indicated)          11. Stormwater hotspots              List of stormwater hotspots from NYSDEC Stormwater Management Design Manual (2015) Chapter 4. Those asterisked need a stormwater pollution prevention plan. "Hotspot" projects have additional post construction stormwater practices design requirements. f. Infiltration rate of soils g. Depth to seasonal high groundwater table i. Depth to bedrock *facilities that generate or store hazardous materials; commercial container nursery none of the above Regulatory sole source aquifer present e. Aquifers industrial sites (based on SIC codes outlined in the SPDES General Permit for Stormwater Discharges Associated with Industrial Discharges) *marinas (service and maintenance) outdoor liquid container storage; outdoor loading/unloading facilities public works storage areas; *vehicle salvage yards and recycling facilities; vehicle fueling stations vehicle service and maintenance facilities; *vehicle and equipment cleaning facilities *fleet storage areas (bus, truck, etc.) Proposed project includes one or more of activities, listed below. Check all that apply Less than 0.5 inches/hour Greater than 0.5 inches/hour Less than or equal to 3 ft Aquifers present No aquifers Greater than 3 ft Less than or equal to 2 ft Greater than 2 ft Stormwater Coalition of Albany County Guidance Document Part I MS4 Forms: 21 of 21 ---PAGE BREAK--- MS4 Oversight of Construction Activity Part II A. Project Parameters Project location; site regulatory features; local laws; policy documents; physical geography; eligibility for construction activity permit coverage; project type (E/SC only, E/SC-Post Cons) p.2 B. Forms and Documents Forms and documentation to submit with p.6 C. Erosion and Sediment Control Components Required content named in Construction Activity Permit GP-0-15-002 and by request from MS4s p.10 D. Post Construction Stormwater Management Components Required content named in Construction Activity Permit GP-0-15-002; the NYS Stormwater Management Design Manual (2015); and by request from MS4s p.17 E. Municipal Requirements-Maps, Construction Drawings, Standards Requirements developed by MS4s to help standardize submissions, clarify MS4 expectations, and visualize all phases of the construction project p.31 Part II. Content Check List - Long Version CONTENT Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 1 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version A. Project Parameters Project Information if present if NA if present if NA 1 1. General Information 2 a. Project name 3 b. Project location (which municipality) 4 c. Project location (tax map numbers-Section/Block/Lot) 5 d. Project location (latitude and longitude; centroid of project; NYTM Units, UTM coordinates). Source of geographic information (NYSDEC Stormwater Interactive Map; NYSDEC Environmental Mapper; Other) 6 e. Project address (if available) 7 f. Name of project owner or operator 8 g. Address of project owner or operator 9 h. If MS4 Acceptance Form required, name of MS4/municipality signing form. 10 2. Project Specifics 11 a. General overview (purpose and extent of proposed development). 12 b. Project area (acres): total site area; total disturbed area; total undisturbed area. Clear statement that total disturbed includes the entire common plan of development. 13 d. Description of project type (erosion and sediment control only or erosion and sediment control and post construction stormwater management practices). The description explains why this project type and references appropriate activities listed in table 1 or Table 2 of Appendix B of the GP-0-15-002 Construction Activity Permit. All relevant activities are included in the description. 14 e. If project is a single family home or single family residential subdivision, project type is stated clearly given percentage of impervious cover at site build-out and location of project relative to potential discharges into 303(d) impaired segements named in the Construction Activity Permit (Appendix E) and MS4 Permit (Appendix 15 f. If project requires post construction stormwater management practices, desciption states whether or not it is New Development, New Development in an Enhanced Phosphorus Removal Watershed, Redevelopment Activity, or Redevelopment Activity and New Development. 16 g. If the project is a Redevelopment Activity, desciption notes status of impervious area (will decrease, increase, or stay the same) 17 h. If project requires review and acceptance by an MS4 town, village, or city the states the local law by number and date which authorizes oversight of construction activity by the MS4; describes the land disturbance acreage which triggers submission of and names local municipal permits for clearing, grubbing, grading, or excavating required by the municipality before land disturbance can begin. Permits may/may not be named in local law. Contents Part II. Content Check List - Long Version Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others A. Project Parameters (location; project activities; site geography; regulatory features; eligibility for permit coverage; E-SC Only or E-SC & Post Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 2 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version A. Project Parameters Project Information if present if NA if present if NA Contents Part II. Content Check List - Long Version Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others A. Project Parameters (location; project activities; site geography; regulatory features; eligibility for permit coverage; E-SC Only or E-SC & Post 18 i. If project is located in a municipality which owns and operates both a separated storm sewer system and a combined sanitary/stormwater system the describes which infrastructure will receive stormwater runoff from this project and describes which local laws, design criteria, and/or regulatory requirements will guide project design. 19 j. If project is owned by the MS4, the references operating procedures used to guide oversight of construction activity and describes any policy documents used to guide the design of post construction stormwater practices. 20 k. If the project requires post construction practices, the list all of the practices proposed for this site by name from the NYSDEC Stormwater Management Design Manual (2015) as well as proprietary practices. Practices not designed in conformance with the performance criteria of the Design Manual are noted. 21 3. Physical Geography; Regulatory Features; Eligibility for General Permit Coverage 22 a. Name of all waterbodies receiving stormwater discharges from this site (includes initial stream segment(s) by NHD stream ID number if possible; stream order of the initial segment(s); identification of segment as tributary, if appropriate; and name of the final receiving water). 23 b. Stream classification of initial receiving waters of construction activity discharges. Note if receiving waters are trout streams (Class C or Class C (TS)) or tributary to source of drinking water (Class AA or AA-s; and 24 c. Regulatory status of initial receiving water of construction activity discharges noting if segment is on the most current NYSDEC 303(d) impaired waterbody list; listed in Appendix E of GP-0-15-002 Construction Activity Permit; listed in Appendix 2 of GP-0-15-003 MS4 Permit (primary pollutant of concern. named) 25 For Albany County: 26 Construction Activity Permit Appendix E 303(d) impaired waterbodies are Ann Lee (Shakers) Pond,/Stump Pond and Basic Creek Reservoir 27 MS4 Permit Appendix 2 impaired waterbodies are Ann Lee (Shakers) Pond/Stump Pond, primary pollutant of concern phosphorus and Basic Creek Reservoir, primary pollutant of concern phosphorus. 28 d. Description of separated storm sewer systems which receive discharges from this project (Who owns it? If MS4, name of MS4.) 29 e. Description, if any of land areas where there is no existing impervious cover and where discharges from construction activities are undertaken on land with a Soil Slope Phase that is identified as an E or F, or the map unit is inclusive of 25% of greater slope on the United State Department of Agriculture ("USDA") Soil Survey for the County. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 3 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version A. Project Parameters Project Information if present if NA if present if NA Contents Part II. Content Check List - Long Version Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others A. Project Parameters (location; project activities; site geography; regulatory features; eligibility for permit coverage; E-SC Only or E-SC & Post 30 f. Description, if any of construction activities or discharges that may adversely affect an endangered or threatened species and actions taken to address issue. (See Check List Part IV. Contents A. Documents). 31 g. Description, if any of construction activities that have the potential to affect an historic property and actions taken to address the issue. (See GP-0-15-002 Construction Activity Permit Part I.F.8 and Check List Part IV. Contents A. Documents) 32 h. Description of natural features influencing construction and maintenance of erosion and sediment controls (site slopes; soil erobility/K-value; infiltration rate; type of soils) 33 i. Description of natural features influencing design of post construction practices(site slopes; soil erobility/K-value; presence/absence of karst topography; depth to seasonally high water table; depth to bedrock; presence/absence of aquifers, including sole source aquifers; site hydrological soil groups infiltration rate) 34 j. Description of man-made features influencing design of post construction practices (presence/absence of fill, utility lines; brownfields; underground storage tanks) 35 k. Description, if any of stormwater hotspots associated with the intended land use or activity of project. Description notes those activities required to prepare a stormwater pollution prevention plan are identified. 36 Land uses and activities deemed stormwater hotspots are listed in the NYS Storomwater Manageement Design Manual (2015) Chapter 4 as follows, with those asterisked needing a stormwater pollution prevention plan: *vehicle salvage yards and recycling facilities; vehicle fueling stations; vehicle service and maintenance facilities; *vehicle and equipment cleaning facilities; *fleet storage areas (bus, truck, etc.); industrial sites (based on SIC codes outlined in the SPDES General Permit for Stormwater Discharges Associated with Industrial Discharges Multi-Sector General Permit; *marinas (service and maintenance); outdoor liquid container storage; outdoor loading/unloading facilities; public works storage areas; *facilities that generate or store hazardous materials; commercial container nursery; other land uses as designated by an appropriate authority. 37 4. General Permit Coverage for Construction Activity 38 a. Statement affirming that this land disturbance project is eligible for general permit coverage under NYSDEC SPDES GP-0-15-002 Construction Activity Permit. 39 If this project results in discharges or activities as described below and the necessary permits are not obtained, the project can not be authorized for Construction Activity general permit coverage. (See NYSDEC GP-0-15-003 Construction Activity Permit Part I.E, pgs.10- 12) 40 ~Discharges after construction activities have been completed and the site has undergone final stabilization; Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 4 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version A. Project Parameters Project Information if present if NA if present if NA Contents Part II. Content Check List - Long Version Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others A. Project Parameters (location; project activities; site geography; regulatory features; eligibility for permit coverage; E-SC Only or E-SC & Post 41 ~Discharges that are mixed with sources of non-stormwater other than those expressly authorized under sub-section E. 3. of the Part and identified in the required by this permit; 42 ~Discharges that required to obtain an individual SPDES permit of another SPDES permit pursuant to Part VII.K. of this permit; 43 ~Construction activites or discharges from construction activities that may adversely affect an endangered or threatened species unless the owner or operator has obtained a permit issued pursuant to 6 Part 182 for the project or the Department has issued a letter of non-jurisdiction for the project. All documentation necessary to demonstrate eligibility shall be maintained on site in accordance with Part II.C.2 of this permit. 44 ~Discharges which either cause or contribute to a violation of water quality standards adopted pursuant to the ECL and its accompanying regulations; 45 ~Construction activities for residential, commercial, and institutional projects: a. Where the discharges from the construction activities are tributary to waters of the state classified as AA or AA-s; and b. Which disturb one or more acres of land with no existing impervious cover; and c. Which are undertaken on land with a Soil Slope Phase that is identified as an E or F, or the map unit name is inclusive of 25% of greater slope, on the United States Department of Agriculture ("USDA") Soil Survey for the County where the disturbance will occur. 46 ~Construction activities for linear transportation projects and linear utility projects: a. Where the discharges from construction activities are tributary to waters of the state classsified as AA or AA-s; and b. Which disturb two or more acres of land with no existing impervious cover; and c. Which are undertaken on land with a Soil Slope Phase that is identified as an E or F, or the map unit name is inclusive of 25% of greater slope, on the United States Department of Agriculture ("USDA") Soil Survey for the County where the disturbance will occur. 47 ~Construction activities that have the potential to affect an historic property, unless there is documentation that such impacts have been resolved. The documentation necessary to demonstrate eligibility with this requirement shall be maintained on site in accordance with Part II.C.2 of this permit and made available to the Department in accordance with Part VII.F of this permit. 48 ~Discharges from construction activities that are subject to an existing SPDES individual or general permit where a SPDES permit for construction activity has been terminated or denied; or where the owner or operator has failed to renew an expired individual permit. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 5 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version B. Forms and Documents Related Documents if present if NA if present if NA 49 1. Construction Activity Permit Forms 50 a. Notice of Intent (NOI) Form for GP-0-15-002 Construction Activity Permit (filled in & signed by signatories named in the Construction Activity Permit) 51 b. Notice of Intent (eNOI) Submission Form. (filled in and signed, if electronic submission is intended). 52 c. Preparer Certification Form for GP-0-15-002 Construction Activity Permit (filled in & signed) 53 d. Owner/Operator Certification Form for GP-0-15-002 Construction Activity Permit (filled in & signed) 54 e. Contractor and Sub Contractor Certification Form (filled in as much as possible.) This is an in-house form developed by the Stormwater Coalition based on language and requirements detailed in GP-0-15-002 Construction Activity Permit, Part III.A.6. At the time of submission the content is filled in as much as possible. Prior to construction, all information must be filled in and is typically finalized at a pre-construction meeting which includes contractors and/or sub- contractors. 55 f. Notice of Termination (NOT) Form For Construction Activities Seeking Authorization Under SPDES General Permit (filled in as much as possible, not signed). 56 2. MS4 Permit Forms Related to Oversight of Construction Activity Permit (Includes forms required by the MS4 Permit and Construction Activity Permit and other forms either developed or requested by the MS4 to help manage construction activity components of their stormwater program). 57 a. MS4 Acceptance Form for Construction Activities Seeking Authorization Under SPDES General Permit (filled in and not signed). Once the is deemed acceptable by the MS4, this form is signed by the MS4 Official (principal executive officer or ranking elected officials or Duly Authorized Representative) 58 b. Notice of Termination (NOT) Form For Construction Activities Seeking Authorization Under SPDES General Permit (At time of submission, filled in as much as possible). Once project is completed, the MS4 Official must sign the Notice of Termination. 59 c. MS4 Construction Site Inspection Form (not filled in) This is an in- house form developed by the Stormwater Coalition or individual MS4s which is based on language and requirements detailed in GP-0-15-003 MS4 Permit Part VII.A.4.a.ix. At the time of submission it is blank. It is included as part of the submission for instructional purposes, highlighting for owner or operators seeking Construction Activity Permit coverage what land use control MS4s will be looking for when conducting site inspections. These inspections are mandated in the MS4 Permit. MS4 Staff/Others Description Part II. Content Check List - Long Version B. Forms and Documents to Submit With Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 6 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version B. Forms and Documents Related Documents if present if NA if present if NA MS4 Staff/Others Description Part II. Content Check List - Long Version B. Forms and Documents to Submit With Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant 60 d. Blank copy of owner or operator: Contractor Maintenance Inspection Report Form (This form is used by the trained contractor to inspect erosion and control practices and pollution prevention measures being implemented within the active work area daily to ensure that they are being maintained in effective operation at all times. The form may be part of the Qualified Inspector Form. It could also be the form used for single family construction projects not required to have a qualified inspector. 61 e. Blank copy of owner or operator: "Qualified Inspector" Inspection Report Form , (Items to include in the form are listed in the Construction Activity Permit, Part IV.C.2.4. pg. 27-28. This form is used for site inspections of all construction activites, with the exception of: the construction of a single family residential subdivision with 25% less impervious cover at total build-out that involves a soil disturbance of one or more acres of land but less than five acres of land and is not located in Appendix C watersheds (East of Hudson; Onondaga Lake; Greenwood Lake; Oscawana Lake; Kinderhook Lake) and not directly discharging to one of the 303(d) segment listed in Appendix E 62 3. Other Documents Named in Construction Activity Permit (GP-0-15- 002) 63 a. State Historic Preservation Act (SHPA) 64 Documentation of Eligibility for General Permit Coverage State Historic Preservation Act (SHPA) requirements. As described in Part I.F.8.a to d. of Construction Activity Permit GP-0-15-002, determining "SHPA"- related eligibility involves multiple steps. As of the release of this check list, required regulatory paperwork is incomplete, in particular the Construction Activity Permit NOI has yet to include questions referenced in the Cultural Resource and Potential Cultural Impacts Flow Charts (Questions 14, 15, 16, and 17). However some SHPA related documentation can be submitted with the as follows. 65 Cultural Resources Screening Flow Chart. Use Flow Chart to explain if the project is Eligible or Not Eligible for coverage, state why. For Eligible Projects note which documents need to be maintained on site. 66 For Eligible Projects, include with the submission, documents to be maintained on site. Possible documents are listed below: 67 i. Map showing that the project is not within an archeological sensitive area and not located or immediately adjacent to a property listed or determined to be eligible for listing on the National and State Register of Historic Places 68 ii. Documentation showing the age of all buildings, structures or objects within the specified distances are less than 50 years old. (If 2015, 50 years = 1965) 69 iii. Documentation from OPRHP, a Historic Preservation Commission of a Certified Local Government, or a qualified preservation professional stating the buildings, structures, or objects that are more than 50 years old within the specified distances are not historically/archeologically significant. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 7 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version B. Forms and Documents Related Documents if present if NA if present if NA MS4 Staff/Others Description Part II. Content Check List - Long Version B. Forms and Documents to Submit With Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant 70 For Not Eligible Projects, review Resolution of Potential Cultural Impacts Flow Chart; submit a Request for State Historic Preservation Act Review; summarize determination. Include the original Request for State Historic Preservation Review and related documentation with submission. 71 Following a State Historic Preservation Review, for projects eventually determined to be eligible by OPRHP and DEC, note what documents need to be maintained on site and include with submission. Possible docuements are listed below; note which are applicable/not applicable. 72 i. NHPA 106 Documents: No Adverse Impact, No Affect, or Memorandum of Agreement 73 ii. SHPA 14.09 documents 74 iii. SEQR EAF with Negative Declaration or Findings Statement; Documentation of OPRHP's agreements with resolution; DEC consultation form sent to OPRHP and copy to DEC APO (Agency Preservation Officer?) 75 iv. Letter of No Impact and DEC Consultation Form 76 v. Letter of No Adverse Impact and DEC Consultation Form 77 vi. Letter of Resolution (LOR) and DEC Consultation Form 78 For Projects which continue to be Not Eligible for coverage, continue to work with DEC APO and OPRHP to resolve. If SHPA issues can not be resolved, the project is ineligible for permit coverage under the general permit for Construction Activity. Other options need to be discussed with NYSDEC. 79 b. State Environmental Quality Review Act ("SEQRA") 80 Documentation that project review pursuant to the State Environmental Quality Review Act ("SEQRA") has been satisfied, when SEQRA is applicable. 81 c. Uniform Procedures Act ("UPA") 82 Documentation that where required, that all necessary Department permits subject to the Uniform Procedures Act ("UPA") (see 6 Part 621 of NYS Environmental Conservation Law (ECL), Article 70) have been obtained. 83 Below is a list of permits included in the GP-0-15-002 Construction Activity Permit Notice Of Intent (pg. 13), presumably named in the "Uniform Procedures Act". For this Check List, note which Permits are "not applicable"; for those permits which are applicable, include with the submission. 84 Air Pollution 85 Coastal Erosion 86 Hazardous Waste 87 Long Island Wells 88 Mined Land Reclamation 89 Solid Waste 90 Navigable Waters Protection/Article15 91 Water Quality Certification 92 Dam Safety 93 Water Supply 94 Freshwater Wetlands/Article 24 95 Tidal Wetlands Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 8 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Check List-Long Version B. Forms and Documents Related Documents if present if NA if present if NA MS4 Staff/Others Description Part II. Content Check List - Long Version B. Forms and Documents to Submit With Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant 96 Wild, Scenic, and Recreational Rivers 97 Stream Bed or Bank Protection/Article 15 98 Endangered or Threatened Species (Incidental Take Permit) 99 Individual SPDES Permit 100 SPDES Multi-Sector Permit 101 Other 102 d. Federal Permits 103 i. Underground Injection Control Permit 104 Copy of permit when certain conditions are met (see NYSDEC Stormwater Management Design Manual (2015), Chapter 4, Section 4.3, page 4-7 for details and reference to EPA documents). 105 ii. Army Corps of Engineers-Wetland Permits 106 4. Documents Pertaining to Post Construction Stormwater Management Practices (Required by MS4) 107 All necessary stormwater easement documentation, if applicable. 108 Maintenance Agreement Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 9 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Ck List-Long Version C. Erosion Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 MS4 Clarificatons & Requests 109 Erosion and sediment control component - All prepared pursuant to this permit shall include erosion and sediment control practices designed in conformance with the technical standards, New York State Standards and Specifications for Erosion and Sediment Control, dated August 2005. Where erosion and sediment control practices are not designed in conformance with the design criteria included in the technical standard, the owner or operator must demonstrate equivalence to the technical standard. 110 If construction activity is a single family home, use Appendix E Erosion and Sediment Control Plan for Small Homesite Construction from the NYS Standards and Specifications for Erosion and Sediment Control dated August, 2005 or provide equivalent details and specifications. 111 At a minimum, the erosion and sediment control component of the shall include the following: 112 Background info about: scope of project, including location, type, and size of project. 113 ~location 114 ~type 115 ~size 116 Site map/construction drawing(s) for the project, including a general location map. 117 At a minimum, the site map shall show: 118 ~the total site area; 119 ~all improvements; 120 ~areas of disturbance; 121 ~areas that will not be disturbed; 122 ~on-site and adjacent off-site surface water(s); 123 ~floodplain/floodway boundaries; 124 ~wetlands and drainage patterns that could be affected by the construction activity; 125 ~existing and final contours; 126 ~existing and final proposed topography a minimum of 50’ beyond the property (min. 2’contours) or as required by MS4 Part II. Content Check List - Long Version C. Erosion and Sediment Control Components Item Consultant MS4 Staff/Others Reviewer(s) Preparer if present if NA Item Location (Pg Erosion and Sediment Control Components Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 10 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Ck List-Long Version C. Erosion Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 MS4 Clarificatons & Requests Part II. Content Check List - Long Version C. Erosion and Sediment Control Components Item Consultant MS4 Staff/Others Reviewer(s) Preparer if present if NA Item Location (Pg Erosion and Sediment Control Components 127 ~locations of different soil types with boundaries; 128 ~material waste, borrow, or equipment storage areas located on adjacent properties; 129 Specific details for: 130 ~material stockpiling 131 ~equipment staging 132 ~material storage 133 ~borrow/spoil areas 134 ~dewatering operations 135 ~spill/waste containment 136 ~concrete wash-out 137 ~location(s) of stormwater discharge(s); 138 ~boundary of the proposed limits of clearing and, if different, limits of grading on the site. 139 A description of the soil(s) present at the site, including identification of the Hydrological Soil Group. 140 Construction phasing plan and sequence of operations describing the intended order of construction activities , including: Phasing plan must limit active disturbance to under 5 acres. 141 ~clearing and grubbing; 142 ~excavation and grading; 143 ~utility and infrastructure installation; 144 ~any other activity at the site that results in soil disturbance 145 ~stockpiling 146 ~final stabilization 147 A description of the minimum erosion and sediment control practices to be installed or implemented for each construction activity that will result in soil disturbance. Include a schedule that: 148 ~ identifies the timing of initial placement or implementation of each erosion and sediment practice and; 149 ~the minimum time frames that each practice should remain in place or be implemented. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 11 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Ck List-Long Version C. Erosion Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 MS4 Clarificatons & Requests Part II. Content Check List - Long Version C. Erosion and Sediment Control Components Item Consultant MS4 Staff/Others Reviewer(s) Preparer if present if NA Item Location (Pg Erosion and Sediment Control Components 150 A temporary and permanent soil stabilization plan that meets the requirements of this general permit and the technical standard, NYS Standards and Specifications for Erosion and Sediment Control dated August, 2005, for each stage of the project, including land clearing and grubbing to project completion and achievement of final stabilization. 151 Specifications for temporary and permanent seeding – note seed types and application rates 152 Statement which reads that in areas where soil activity has temporarily or permanently ceased, the application of soil stabilization measures must be initiated by the end of the next business day and completed within fourteen (14) days from the date the current soil disturbance activity ceased. 153 For construction sites that directly discharge to one of the 303(d) listed segments in Appendix E (Ann Lee (Shakers) Pond, Stump Pond, Basic Creek Reservoir), a statement which reads that the application of soil stabilization measures must be initiatiated by the end of the next business day and completed within seven days from the date the current soil disturbance activity ceased. 154 A site map/construction drawing(s) showing the specific location(s), size(s), and length(s) of each erosion and sediment control practice 155 Descriptions of structural practices used to divert flows from exposed soils, store flows, or otherwise limit runoff and the discharge of pollutants from the exposed areas of the site Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 12 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Ck List-Long Version C. Erosion Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 MS4 Clarificatons & Requests Part II. Content Check List - Long Version C. Erosion and Sediment Control Components Item Consultant MS4 Staff/Others Reviewer(s) Preparer if present if NA Item Location (Pg Erosion and Sediment Control Components 156 The dimensions, material specifications, installation details, and operation and maintenance requirements for all erosion and sediment control practices. Include the location and sizing of any temporary sediment basins and structural practices that will be used to divert flows from exposed soils 157 Calculations for siting and sizing of any temporary sediment basins and/or traps 158 Identification of any maintenance or inspection actions that are required prior to converting practices to permanent control measures 159 A maintenance inspection schedule for the contractor(s) identified in Part III.A.6 of GP 0-15-002, to ensure continuous and effective operation of the erosion and sediment control practices. The maintenance inspection schedule shall be in accordance with the requirements of the technical standard, NYS Standards and Specifications for Erosion and Sediment Control dated August, 2005. 160 A description of the pollution prevention measures that will be used to control litter, construction chemicals, and construction debris from becoming a pollutant source 161 ~control litter 162 ~construction chemicals 163 ~construction debris 164 Description of construction and waste materials expected to be utilized on-site or adjacent to site 165 Description of controls to reduce pollutants from these materials 166 Description of cleanup procedures and spill prevention and notification for each material 167 A description and location of any stormwater discharges associated with industrial activity other than construction at the site, including but not limited to, stormwater discharges from asphalt plants and concrete plants located on the construction site. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 13 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Ck List-Long Version C. Erosion Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 MS4 Clarificatons & Requests Part II. Content Check List - Long Version C. Erosion and Sediment Control Components Item Consultant MS4 Staff/Others Reviewer(s) Preparer if present if NA Item Location (Pg Erosion and Sediment Control Components 168 Identification of any elements of the design that are not in conformance with the design criteria in the technical standard, NYS Standards and Specifications for Erosion and Sediment Control dated August, 2005… 169 ~include the reason for the deviation or alternative design 170 ~provide information which demonstrates that the deviation or alternative design is equivalent to the standard. 171 If project is in a regulated MS4, description of winter month, October 15 to April 15, requirements related to E&SC (i.e. anchoring mulch material, sediment removal from basins/traps, use of winter rye seed, offset silt fence, etc.). See Winter Shutdown and Site Inspection Requirements available from MS4. 172 TRACKING SPECIFIC DESIGN ELEMENTS: 173 To help track the review of E/SC practices for presence/absence, size, and length information, MS4s may want to call out practices of concern and note comments. Space is provided here for that purpose. 174 E/SC Practice #1 Description of Practice: Location present, Y/N Size present Y/N Length present, Y/N Comments: Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 14 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Ck List-Long Version C. Erosion Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 MS4 Clarificatons & Requests Part II. Content Check List - Long Version C. Erosion and Sediment Control Components Item Consultant MS4 Staff/Others Reviewer(s) Preparer if present if NA Item Location (Pg Erosion and Sediment Control Components 175 E/SC Practice #2 Description of Practice: Location present, Y/N Size present Y/N Length present, Y/N Comments: 176 To help track the review of each E/SC practice for presence/absence of dimension, material specification, installlation details, and operation and maintenance requirements for erosion and control practices MS4s may want to call out specific practices of interest and make comments. Space is provided here for that purpose. 177 E/SC Practice #1 Description of Items present: Dimensions, Installation details,Y/N__? Operation and maintenance requirements, If temporary sediment basin, location present, Size present, If structural practice to divert flows, location present, Y/N Size present, Y/N Comments: 178 E/SC Practice #2 Description of Items present: Dimensions, Installation details,Y/N__? Operation and maintenance requirements, If temporary sediment basin, location present, Size present, If structural practice to divert flows, location present, Y/N Size present, Y/N Comments: Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 15 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part II. Content Ck List-Long Version C. Erosion Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 MS4 Clarificatons & Requests Part II. Content Check List - Long Version C. Erosion and Sediment Control Components Item Consultant MS4 Staff/Others Reviewer(s) Preparer if present if NA Item Location (Pg Erosion and Sediment Control Components 179 To help track design elements not in conformance with the design criteria in the technical standards, MS4s may want call out specific practices of interest, as follows, and make comments. Space is provided here for that purpose. 180 Non-Conforming Design Element #1 Description: Reason for deviation or alternate design present, Info demonstrating that deviation or alternative design is equivalent to standard present, Comments: 181 Non-Conforming Design Element #2 Description: Reason for deviation or alternate design present, Info demonstrating that deviation or alternative design is equivalent to standard present, Comments: Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 16 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests 182 From Construction Activity Permit: 183 Post-construction stormwater management component-The owner or operator of any construction project identified in Table 2 of Appendix B as needing post-construction stormwater management practices shall prepare a that includes practices designed in conformance with the applicable sizing criteria in Part I.C.2.a.,c. or d. of this permit and performance criteria in the technical standard, New York State Stormwater Management Design Manual dated January 2015. 184 Where post-construction stormwater management practices are not designed in conformance with the performance criteria in the technical standard, the owner or operator must include in the the reason(s) for the deviation or alternative design and provide information which demonstrates that the deviation or alternative design is equivalent to the technical standard. 185 The post-construction stormwater management practice component of the shall include the following: 186 Identification of all post-construction stormwater management practices to be constructed as part of the project. Include the dimensions, material specifications and installation details for each post-construction stormwater management practice. 187 A site map/construction drawing(s) showing the specific location and size of each post-construction stormwater management practice 188 Stormwater Modeling and Analysis Report that includes: 189 ~Map(s) showing pre-development conditions, including watershed/sub- catchment boundaries, flow paths/routing, and design points Watershed/sub-catchment includes any upstream watersheds draining onto the project site and the associated stormwater collection and conveyance structures Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 17 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 190 ~Map(s) showing post-development conditions, including watershed/sub- catchment boundaries, flow paths/routing, design points, and post-construction stormwater practices Watershed/sub-catchment includes any upstream watersheds draining onto the project site and the associated stormwater collection and conveyance structures 191 ~Results of stormwater modeling (i.e. hydrology and hydraulic analysis) for the required storm events, include supporting calculations (model runs), methodology, and a summary table that compares pre and post development runoff rates and volumes for different storm events. 192 ~Summary table, with supporting calculations, which demonstrates that each post- construction stormwater practice has been designed in conformance with the sizing criteria included in the Design Manual 193 ~Identification of any sizing criteria that is not required based on the requirements included in Part I.C. of this permit. 194 ~Identification of any elements of the design that are not in conformance with the performance criteria in the Design Manual. Include the reason(s) for the deviation or alternative design and provide information which demonstrates that the deviation or alternate design is equivalent to the Design Manual. 195 Soil testing results and locations (test pits, borings) Logs and mapping of borehole or test pits for all identified post construction practices. Testing is conducted in conformance with the NYS Stormwater Management Design Manual (2015) Appendix D. Includes the geotechnical report, if generated. Soil tests at location of practice, to depth of practice, seasonal high groundwater elevation noted. 196 Infiltration results, when required, in particular at location of stormwater management practices. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 18 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 197 From Construction Activity Permit: 198 If Enhanced Phosphorus Removal Watershed(s): 199 All construction projects identified in Table 2 of Appendix B that are located in the watersheds identified in Appendix C shall prepare a that includes post- construction stormwater management practices designed in conformance with the applicable sizing criteria in Part I.C.2.b.c. or d. of this permit and the performance criteria, Enhanced Phosphorus Removal Standards included in the Design Manual. 200 Chapter 3 Stormwater Management Planning Requirements (Five Step Process) MS4 Requests & Clarifications 201 Planners and designers must address this approach (i.e. stormwater management planning) in a step-wise process that involves site planning and stormwater management practice (SMP) selection. This includes providing information in the which documents compliance with the required process. The steps include: 202 The Six Step Process for Stormwater Site Planning and Practice Selection 203 Step 1 Site Planning 204 The designer uses practices identified in Design Manual Chapter 3, Table 3.1 to protect natural resources and utilize the hydrology of the site before laying out the proposed development. The Preservation of Natural Resources practices include protecting natural areas, avoiding sensitive areas and minimizing grading and soil disturbance. Text or chart which describes how Preservation of Natural Resources practices have been incorporated into the Stormwater Management Plan. 205 Table 3.1 Green Infrastructure Planning General Categories and Specific Practices 206 Preservation of Natural Resources Practices 207 Preservation of Undisturbed Areas 208 Preservation of Buffers 209 Reduction of Clearing and Grading Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 19 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 210 Locating Development in Less Sensitive Areas 211 Open Space Design 212 Soil Restoration 213 The designer then considers practices to reduce impervious cover when laying out the intial site design. The Reduction of Impervious Cover practices include conservation design and reducing impervious cover in roads, drivewayts, and parking lots. Text or chart which describes how Reduction of Impervious Cover practices have been incorporated into the Stormwater Management Plan. 214 Table 3.1 Green Infrastructure Planning General Categories and Specific Practices (cont'd). 215 Reduction of Impervious Area Practices 216 Roadway Reduction 217 Sidewalk Reduction 218 Driveway Reduction 219 Cul-de-sac Reduction 220 Building Footprint Reduction 221 Parking Reduction 222 The must include an evaluation of all green infrastructure planning measures as they apply to the site. The evaluation process requires the following measures: 223 1. Developing a map that identifies natural resource areas and drainage patterns, including, but not limited to: 224 ~Wetlands (jurisdictional, wetland of special concern) ~Map includes NYSDEC freshwater wetlands and adjacent area boundaries or certification of no wetlands 225 ~Map includes boundary of US Army Corps of Engineers wetlands under federal jurisdiction or certification of no wetlands 226 ~Waterways (major, perennial, intermittent, springs) ~Map includes location of adjacent perennial and intermittent streams using NYSDEC classification and naming of surface waters, note as text or on map, waterways included on the impaired 303 waterbody list Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 20 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 227 ~Buffers (stream, wetlands, forest, etc.) ~Map includees location and boundaries of resource areas and status of protection (protected/not protected); includes stream buffers, wetland buffers, forest buffers, etc.) 228 ~Floodplains ~Map includes100-yr floodplain and floodway limits if disturbance proposed is in the floodplain 229 ~Forest, vegetative cover ~Map includes description and boundaries of the existing predominant vegetative cover on the project site 230 ~Critical areas ~Map includes location and boundaries of resource protection areas (water supply well setbacks, septic system setbacks, sole source aquifers, etc.) 231 ~Topography (contour lines, existing flow paths, steep slopes, etc.) ~Map includes existing topography a minimum of 50’ beyond the property (min. 2’contours), or as required by MS4 232 ~Soil (hydrological groups, highly erodible soils, etc.) ~Map includes description and map of all soils on the site ( HSG, highly erodible soils, E and F Soil Slope Phase, others) 233 ~Bedrock, significant geological features ~Map notes location of karst bedrock, if any 234 ~If project near Hudson River, map notes location of sea-level rise projections along Hudson for 2020, 2050, and 2080 ClimAID Supplement Risk Information September, 2014 (Rule making pending-Community Risk and Resiliency Act) 235 2. Devising the strategies for protection and enhancement of natural resources 236 Prior to site layout, preserve natural features (site fingerprinting) 237 Utilize natural features to preserve the natural hydrology Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 21 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 238 Maximize the retention of forest cover and undisturbed soils 239 Avoid erodible soils on steep slopes and limit mass grading 240 3. Reduce the impacts of development by reducing impervious surfaces 241 4. Demonstrating that all reasonable opportunities for preserving natural conditions of the site are employed to minimize the runoff and maintain the pre- construction hydrology 242 During the planning step, the designer should check with municipalities to determine if there are local laws and ordinances that regulate wetlands, stream buffers, forest or habitat protection, erosion control or grading. The designer should also consult the municipalilty for laws relating to conservation or cluster design, roads, driveways, and parking lots to determine level of flexibility in reducing impervious surfaces. acknowledges and complies with applicable local laws . 243 Step 2 Determine Water Quality Treatment Volume (WQv) 244 The designer calculates the required WQv for the site using criteria in Chapter 4. Once the preliminary site layout is prepared: 245 ~impervious areas are defined calculates impervious area using Design Manual Chapter 4 definition. Total area, impervious area, % impervious calculated for each sub-catchment. % impervious used in WQv calculations. 246 ~sub-catchments are delineated text and related maps identify the sub-catchments used to calculate water quality volume (WQv). 247 ~designer calculates the water quality volume Water quality volume calculations matched to sub- catchment and impervious areas. 248 Step 3 Apply Runoff Reduction Techniques and Standards SMPs with RRv Capacity (e.g. infiltration practices, bioretention, open channel practices) to Reduce Total WQv Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 22 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 249 includes a thorough and clear analysis of: 250 1) how the require total WQv was calculated; 251 2) description and calculation of minimum runoff reduction requirement; 252 3) description of runoff reduction calculations for each of the techniques listed in Table 3.2 and SWPs with RRV capacity; 253 4) reason why a particular runoff reduction technique or techniques were selected by the designer; 254 5) reasons why a particular runoff reduction technique was not selected; and 255 6) for redevelopment projects use of any runoff reduction techniques, if any 256 Table 3.2 Runoff Reduction Techniques: 257 Conservation of Natural Areas 258 Sheetflow to riparian buffers or filter strips 259 Vegetative open swale 260 Tree planting/tree box 261 Stream daylighting for redevelopment projects 262 Rain garden 263 Green roof 264 Stormwater planter 265 Rain tank/cistern 266 Porous pavement 267 SMPs with RRv capacity of WQv provided by the practice): 268 Infiltration Practices, 100% 269 Bioretention Practice, 100% in HSG A and B (without underdrain) and 40% HSG and D (with underdrain) 270 Dry Swale (Open Channel Practices), 40% in HSG A and B and 20% in HSG C and D Designer experiments with combinations of runoff reduction techniques and standard SMPs with RRv capacity on site. In each case, the designer estimates the spatial area to be treated by each runoff reduction technique, potentially reducing the required WQv by incorporating runoff reduction techniques or standard SMPs with RRv capacity within each drainage area on the site. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 23 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 271 If the standard SMPs with RRv capacity listed above are used to address RRv criteria, the practices must be designed to capture runoff at the source. text describes location of any standard SMPs with RRv capacity included in the and provides an estimated distance from source of runoff to SMP. 272 By applying a combination of runoff reduction techniques and standard SMPs with RRv capacity, the designer must reduce 100% of the WQv calculated in Step 2. If the RRv calculated in Step 3 is greater than or equal to WQv, the designer has met the RRv requirement and may proceed to Step 6. text states clearly based on calculated values documented in the (runoff reduction worksheets) that the RRv value is greater than or equal to WQv value. 273 Acceptable site limitations include conditions that prevent the use of an infiltration technique and or infiltration of the total WQv. Typical site limitations include: seasonal high groundwater; shallow depth to bedrock; soils with an infiltration rate less than 0.5 inches/hour. For construction activities that can not reduce the total WQv, the designer shall identify the specific site limitations in the If runoff reduction volume can not be met, states clearly specific site limitations related to all possible runoff reduction techniques. Explanation references data from soil borings, test pits, and infiltration tests. 274 In the event that a designer cannot reduce 100% of the WQv due to site limitations, they shall direct runoff from all newly constructed impervious areas to a RR technique or standard SMP with RRv capacity unless infeasible. If designer can not reduce 100% of the WQv due to site limitations, the states which runoff reduction techniques or standard SMP with RRv capacity will be used unless infeasible. 275 Step 4 Determine the minimum RRv required 276 In Step 4, the designer determines the minimum RRv required for the construction activity as calculated using the criteria in Secton 4.3 of the Design Manual and compares this to the runoff reduction achieved from impervious surfaces (determined in Step In no case shall the runoff reduction achieved from the newly constructed impervious areas be less than the Minimum RRv. text describes how the minimum RRv was calculated. 277 Step 5 Apply Standard Stormwater Management Practices to Address Remaining Water Quality Volume Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 24 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 278 In Step 5, the designer uses standard SMPs such as filtering practices, ponds, or stormwater wetlands to treat the remaining water quality volume that cannot be reduced by applying the runoff reduction techniques and standard SMPs with RRv capacity. The designer must verify that the RRv requirement has been met; otherwise the plan does not comply with the required sizing criteria in Chapter 4. text describes how much of the water quality volume will be treated using runoff reduction techniques or SMPs with RRv capacity and describes which standard SMPs will be used to treat the remaining WQv 279 Step 6 Apply Volume and Peak Rate Control Practices if Still Needed to Meet Requirements 280 The channel protection volume, overbank flood control, and extreme flood control must be met for the plan to be completed. In Step 6, the designer may use practices such as infiltration basins, dry detention basins, and blue roofs to meet water quantity requirements. text describes which channel protection; overbank flood control, and extreme flood controls will be used to meet water quantity requirements, as needed. 281 Criteria for Practice Addition 282 All proposed alternative stormwater management practices in new construction are considered to be in deviation from State Standards. text, as needed describes alternate stormwater management practices in new construction. Description includes all relevant explanations regarding equivalency, required performance and sizing criteria, and requirements related to proprietory practices. 283 If alternative stormwater practices are included in such practices must provide a full description to justify the reasons(s) for deviation as well as detailed justification on how the proposed practice is equivalent to the standards defined n this Design Manual. 284 In order to be in compliance with the technical standards, projects must meet both the required performance and sizing criteria. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 25 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 285 The equivalency of the performance of the proposed new technologies to the performance criteria required by New York State must be verified and certified by one of the sources accepted by the Department and documented in the 286 Exceptions to Meeting the Runoff Reduction Volume (RRV) Criteria: 287 1. If a redevelopment activity, although encouraged, meeting the RRv criteria is not required for redevelopment activities that meet the criteria in Chapter 9 of the Design Manual. If project is a redevelopment activity, text explains Chapter 9 criteria and status of this project for meeting RRv criteria. 288 2. If karst geology, meeting the RRv criteria is required for projects over karst geology. However, use of large infiltration basins must be avoided and geotechnical assessment is recommended for infiltration and recharge at small scales If project is located in area with karst geology, text explains results of recommended geotechnical assessment, the need to avoid large infiltration basins; and explains why and which runoff reduction techniques are included in the 289 3. If the project meets the "hotspot" criteria in Chapter 4 of the Design Manual, designers shall use non-infiltration type practices to meet RRv criteria. If project activity will result in or include any of the NYSDEC stormwater hotspots, the describes which non- infiltration type practices will be used to meet the RRv criteria. 290 Chapter 9 Redevelopment Activity NYSDEC Stormwater Management Design Manual-2015 MS4 Requests & Clarifications 291 Determinations regarding waiver of water quantity requirements: 292 10- and 100-year water quantity control criteria waived because no change in hydrology will occur that would increase the discharge rate from the site Calculations indicating no alteration of hydrology that would increase discharge rate (ref. Results of stormwater modeling, Ck List Item Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 26 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 293 Channel protection water quantity control criteria waived because no change in hydrology will occur that would increase the discharge rate from the site Calculations showing that the post-construction 1-yr 24- hour discharge rate and velocity will not exceed the pre-construction condition (ref. Results of Stormwater Modeling: Ck List Item No. 294 Treatment is required for 100% of runoff from newly created impervious surfaces and 25% of redeveloped (pre-existing) impervious surfaces Calculation of the water quality volume with separate components for new impervious surfaces and reconstructed impervious surfaces (ref. Step 2, Determine Water Quality Treatment Volume: Ck List Item 295 Option selected for meeting the water quality criteria for redeveloped portions of site (or all of site if no increase in impervious): 296 __Impervious cover at close of construction reduced by at least 25% of the total disturbed impervious area, with soil restoration in newly created pervious areas Site plans clearly indicate areas converted from impervious to pervious conditions and text/narrative shows acreages or square footage reduced 297 minimum of 25% of the WQv from the disturbed impervious area is captured and treated by standard practices or reduced by runoff reduction techniques. Site plans show location of standard or runoff reduction practices and indicate the contributing drainage areas to them. 298 __Alternative ("proprietary") practices will treat 75% of the WQv from the disturbed impervious area as well as any additional runoff from tributary areas outside the disturbed impervious area. Site plans show location of proprietary practices and drainage areas to them, and list the manufacturer and model for validation that the technology is accepted by NYSDEC. 299 combination of the above three approaches is proposed and weighted using the following formula: %WQv treatment by Altnerative practice = (25 - (%IC reduction + WQv treatment by Standard practice + % Runoff reduction)) x 3 If this formula is used to determine the proportion of the WQv that must be handled by alternative practice, inputs to the calculation should be provided with supporting data. Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 27 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 300 From Construction Activity Permit: 301 An operations and maintenance plan that includes inspection and maintenance schedules and actions to ensure continuous and effective operation of each post- construction stormwater management practice. 302 Chapter 3 Stormwater Management Planning (Operations & Maintenance Plan) 303 Operations and maintenance plan, which: 304 a. identifies the location of stormwater management practice signage (runoff reduction practices and standard stormwater management practices) which notes that the sign is to be erected or posted in the immediate vicinity of the stormwater management practice, not less than 18 inches by 24 inches (or 10" x 12" for footprints smaller than 400 sf) bearing the following information: Stormwater Management Practice - (name of the practice); Must Be Maintained In Accordance With O & M Plan; DO NOT REMOVE OR ALTER 305 b. identifies entity that will be reponsible for long term operation and maintenance of each practice 306 c. identifies mechanism used to ensure long term operation and maintenance of the stormwater management practices (deed covenant, easements/right of way, executed maintenance agreement, etc.) 307 d. includes a copy of the mechanism used to ensure long term operation and maintenance of the stormwater management practices (deed covenant, easements/right of way, executed maintenance agreement, etc.). 308 e. includes a copy of the schematics of the practice, with the measurements of design specifications clearly defined 309 f. notes proper frequency of maintenance and includes inspection and maintenance schedule 310 g. includes a maintenance log for tracking and observation 311 h. notes actions to ensure continuous and effective operation of each post construction stormwater practice; Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 28 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 312 TRACKING SPECIFIC DESIGN ELEMENTS: 313 To help track the review of post construction stormwater management practices for require elements, reviewers may want to call out practices of concern and note comments. Space is provided here for that purpose. 314 Post Construction Practice #1 Description of Practice: Sizing criteria met, Performance criteria met, Required elements present,Y/N?___ 315 Post Construction Practice #2 Description of Practice: Sizing criteria met, Performance criteria met, Required elements present,Y/N?___ 316 To help track design elements not in conformance with the design criteria in the technical standards, MS4s may want call out specific practices of interest, as follows, and make comments. Space is provided here for that purpose. 317 Non-Conforming Design Element #1 Description: Reason for deviation or alternate design present, Info demonstrating that deviation or alternative design is equivalent to standard present, Comments: Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 29 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests Part II. Content Check List - Long Version D. Post Construction Stormwater Management Components Item Reviewer(s) Consultant MS4 Staff/Others Preparer if present if NA Item Location (Pg Post Construction Stormwater Management 318 Non-Conforming Design Element #2 Description: Reason for deviation or alternate design present, Info demonstrating that deviation or alternative design is equivalent to standard present, Comments: Stormwater Coalition of Albany County Guidance Document Part II CkList Long: 30 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long Version E. Municipal/MS4 Requirements Municipal Requirements Drawings, Maps, Specifications, Standards if present if NA if present if NA Requested by MS4s 319 Map requirements (can be incorporated into other maps) 320 ~project boundary, 321 ~adjacent parcels, 322 ~streets 323 ~adjacent municipalities 324 ~adjacent MS4s of all types 325 Standardization: 326 For stormwater practices which require sizing: Use standard Town of Colonie rainfall amounts for the 1, 2, 10, 25, 50, 100-year 24-hour and 90% rainfall events. They are 1-yr = 2.5”, 2-yr = 2.8”, 10-yr = 4.5”, 25-yr = 5.0”; 50-yr = 5.8”; 100-yr = 7.0”, and 90% rainfall = 1.2”. 327 RAINFALL AMOUNTS EXPLAINED: To minimize biassed interpretations of isohyet maps in the NYSDEC Stormwater Management Design Manual 2015 and to promote a consistent review of applications, the Town of Colonie established rainfall amounts to be applied throughout the Town for all projects. These amounts are based on the NYSDEC 2015 Stormwater Design Manual 2015 isohyet maps in Chapter 4 Uniform Stormwater Sizing Criteria and recommendations from consulting engineers hired by the Town to review applications. None of these standardized amounts are lower than all possible 2015 isohyet precipitation amounts for Albany County, and in some cases thery are higher. Also, as stated in teh Design Manual, "Designers may also use the most recent rainfall frequency values developed by acceptable sources. These maps are available online at http://precip.eas.cornell.edu.”. For the purposes of this check list, either the Town of Colonie rainfall amounts or the Extreme Precipitation in New York and New England, An Interactive Web Tool for Extreme Precipitation (http://precip.eas.cornell.edu.) dataset is acceptable. 328 Use of City-Town-Village-County-University Standard Specifications (if any) for design of the storm drain system (i.e. catch basins, manholes, piping, etc.) 329 Construction drawings: 330 Stamped construction drawings and with the signature and seal of a ‘Qualified Professional as defined in GP-0-15-002 Construction Activity Permit. 331 Location of existing and proposed roadways, lot boundaries, buildings, and other structures 332 Location of existing and proposed utilities (e.g. water, sewer (sanitary and storm), gas, electric) and easements 333 Location of existing and proposed conveyance systems (i.e. swales, MHs, CBs, pipes, etc.) 334 Existing and proposed elevations for storm drain structures (i.e. pipes, CBs, manholes, etc.). Include vertical separation distances for all utilities. 335 Flow paths of surface and subsurface stormwater management structures (use flow arrows) 336 Locations and dimensions of all proposed channel modifications (i.e. bridges & culverts) 337 Final landscaping plans - include buffer zones, reforestation, or wetland mitigation areas Consultant MS4 Staff/Others Part II. Content Check List - Long Version E. Municipal Requirements for Drawings, Maps, and Specifications Pertaining to Stormwater Management Item Preparer Reviewer(s) if present if NA Item Location (Pg Stormwater Coalition of Albany County 3/23/2016 Part II CkList Long: 31 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part II. Content Ck List-Long Version E. Municipal/MS4 Requirements Municipal Requirements Drawings, Maps, Specifications, Standards if present if NA if present if NA Requested by MS4s Consultant MS4 Staff/Others Part II. Content Check List - Long Version E. Municipal Requirements for Drawings, Maps, and Specifications Pertaining to Stormwater Management Item Preparer Reviewer(s) if present if NA Item Location (Pg 338 Location of sea-level rise projections along Hudson for 2020, 2050, and 2080 ClimAID Supplement Risk Information September, 2014 Stormwater Coalition of Albany County 3/23/2016 Part II CkList Long: 32 of 32 ---PAGE BREAK--- MS4 Oversight of Construction Activity Part III A. Project Parameters Same content as Part II.A. (Numbering of line items is the same as Part II. Content Check List. Where appropriate, content has been abbreviated. p.2 B. Forms and Documents Same content as Part II.B. (see above) p.4 C. Erosion and Sediment Control Components Same content as Part II.C. (see above) p.5 D. Post Construction Stormwater Management Components Same content as Part II.D. (see above) p.10 E. Municipal Requirements-Maps, Construction Drawings, Standards Same content as Part II.E. (see above) p.19 Part III. Content Check List - Short Version CONTENT Stormwater Coalition of Albany County Guidance Document Part III CkList-Short: 1 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Check List-Short Version A. Project Parameters Project Information if present if NA if present if NA 1 1. General Information 2 a. Project name 3 b. Project location (which municipality) 4 c. Project location (tax map numbers-Section/Block/Lot) 5 d. Project location (latitude and longitude) 6 e. Project address (if available) 7 f. Name of project owner or operator 8 g. Address of project owner or operator 9 h. If MS4 Acceptance Form required, name of MS4 10 2. Project Specifics 11 a. General overview (purpose and extent of proposed development). 12 b. Project area (acres) 13 d. Description of project type (E/SC or E/SC and post construction stormwater practices) 14 e. Project type is stated clearly given Construction Activity Permit (Appendix E) and MS4 Permit (Appendix 15 f. Project type states whether or not it is New Development, New Development in an Enhanced Phosphorus Removal Watershed, Redevelopment Activity, or Redevelopment Activity and New Development. 16 g. If Redevelopment Activity, status of impervious area (will decrease, increase, or stay the same) noted. 17 h. states the local law by number and date which triggers submission of and names required local municipal permits for clearing, grubbing, grading, or excavating. 18 i. describes which infrastructure (separated or combined) will receive stormwater runoff from project, describes which local laws, design criteria, and/or regulatory requirements will guide project design. 19 j. For projects owned by the MS4, describe any policy documents used to guide the design of post construction stormwater practices. 20 k. List all of the practices proposed for this site. Contents Part III. Content Check List - Short Version A. Project Parameters (location; project activities; site geography; reg features; E-SC Only or E-SC & Post Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 2 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Check List-Short Version A. Project Parameters Project Information if present if NA if present if NA Contents Part III. Content Check List - Short Version A. Project Parameters (location; project activities; site geography; reg features; E-SC Only or E-SC & Post Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others 21 3. Physical Geography; Regulatory Features; Eligibility for General Permit Coverage 22 a. Name of all waterbodies receiving stormwater discharges from this site 23 b. Stream classification of initial receiving waters of construction activity discharges. 24 c. Regulatory status of initial receiving water of construction activity discharges 28 d. If project discharges directly to separated storm sewer systems, name of owner? If MS4, name of MS4.? 29 e. Description, if any of land areas where Soil Slope Phase is identified as an E or F, or the map unit is inclusive of 25% of greater slope on the USDA Soil Survey for the County. 30 f. Description, if any of construction activities or discharges that may adversely affect an endangered or threatened species and actions taken to address issue. 31 g. Description, if any of construction activities that have the potential to affect an historic property and actions taken to address the issue. 32 h. Description of natural features influencing construction and maintenance of erosion and sediment controls (site slopes; soil erobility/K-value; infiltration rate; type of soils) 33 i. Description of natural features influencing design of post construction practices 34 j. Description of man-made features influencing design of post construction practices 35 k. Description, if any of stormwater hotspots associated with the intended land use or activity of project. 37 4. General Permit Coverage for Construction Activity 38 a. Statement affirming that this land disturbance project is eligible for general permit coverage under NYSDEC SPDES GP-0-15-002 Construction Activity Permit. Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 3 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Check List-Short Version B. Forms and Documents Related Documents if present if NA if present if NA 49 1. Construction Activity Permit Forms 50 a. Notice of Intent (NOI) Form 51 b. Notice of Intent (eNOI) Submission Form. 52 c. Preparer Certification Form 53 d. Owner/Operator Certification Form 54 e. Contractor and Sub Contractor Certification Form 55 f. Notice of Termination (NOT) Form 56 2. MS4 Permit Forms Related to Oversight of Construction Activity Permit 57 a. MS4 Acceptance Form 58 b. Notice of Termination (NOT) Form (filled in as much as possible for MS4) 59 c. MS4 Construction Site Inspection Form (not filled in) 60 d. Blank copy of owner or operator: Contractor Maintenance Inspection Report Form 61 e. Blank copy of owner or operator: "Qualified Inspector" Inspection Report Form 62 3. Other Documents Named in Construction Activity Permit (GP-0-15- 002) 63 a. State Historic Preservation Act (SHPA) 79 b. State Environmental Quality Review Act ("SEQRA") 81 c. Uniform Procedures Act ("UPA") 102 d. Federal Permits 103 i. Underground Injection Control Permit 105 ii. Army Corps of Engineers-Wetland Permits 106 4. Documents Pertaining to Post Construction Stormwater Management Practices (Required by land use control MS4) 107 All necessary stormwater easement documentation, if applicable. 108 Maintenance Agreement Description Part III. Content Check List - Short Version B. Forms and Documents to Submit With Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 4 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Ck List-Short C. Erosion and Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 MS4 Clarificatons & Requests 110 If construction activity is a single family home, use Appendix E Erosion and Sediment Control Plan for Small Homesite Construction from the NYS Standards and Specifications for Erosion and Sediment Control dated August, 2005 or provide equivalent details and specifications. 111 At a minimum, the erosion and sediment control component of the shall include the following: 112 Background info about: scope of project, including location, type, and size of project. 116 Site map/construction drawing(s) for the project, including a general location map. 117 At a minimum, the site map shall show: 118 ~the total site area; 119 ~all improvements; 120 ~areas of disturbance; 121 ~areas that will not be disturbed; 122 ~on-site and adjacent off-site surface water(s); 123 ~floodplain/floodway boundaries; 124 ~wetlands and drainage patterns that could be affected by the construction activity; 125 ~existing and final contours; 126 ~existing and final proposed topography a minimum of 50’ beyond the property (min. 2’contours) or as required by MS4 127 ~locations of different soil types with boundaries; 128 ~material waste, borrow, or equipment storage areas located on adjacent properties; 129 Specific details for: 130 ~material stockpiling 131 ~equipment staging 132 ~material storage 133 ~borrow/spoil areas 134 ~dewatering operations 135 ~spill/waste containment 136 ~concrete wash-out MS4 Staff/Others Part III. Content Check List - Short Version C. Erosion and Sediment Control Components Item Preparer Reviewer(s) Erosion and Sediment Control Components if present if NA Item Location (Pg Consultant Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 5 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Ck List-Short C. Erosion and Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 MS4 Clarificatons & Requests MS4 Staff/Others Part III. Content Check List - Short Version C. Erosion and Sediment Control Components Item Preparer Reviewer(s) Erosion and Sediment Control Components if present if NA Item Location (Pg Consultant 137 ~location(s) of stormwater discharge(s); 138 ~boundary of the proposed limits of clearing and, if different, limits of grading on the site. 139 A description of the soil(s) present at the site, including identification of the Hydrological Soil Group. 140 Construction phasing plan and sequence of operations describing the intended order of construction activities, including: Phasing plan must limit active disturbance to under 5 acres. 141 ~clearing and grubbing; 142 ~excavation and grading; 143 ~utility and infrastructure installation; 144 ~any other activity at the site that results in soil disturbance 145 ~stockpiling 146 ~final stabilization 147 A description of the minimum erosion and sediment control practices to be installed or implemented…. Include a schedule that: 148 ~ identifies the timing of initial placement or implementation of each erosion and sediment practice and; 149 ~the minimum time frames that each practice should remain in place or be implemented. 150 A temporary and permanent soil stabilization plan 151 Specifications for temporary and permanent seeding – note seed types and application rates 152 Statement which reads that in areas where soil activity has temporarily or permanently ceased, the application of soil stabilization measures must be initiated by the end of the next business day and completed within fourteen (14) days from the date the current soil disturbance activity ceased. Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 6 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Ck List-Short C. Erosion and Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 MS4 Clarificatons & Requests MS4 Staff/Others Part III. Content Check List - Short Version C. Erosion and Sediment Control Components Item Preparer Reviewer(s) Erosion and Sediment Control Components if present if NA Item Location (Pg Consultant 153 For construction sites that directly discharge to one of the 303(d) listed segments in Appendix E, a statement which reads that the application of soil stabilization measures must be initiatiated by the end of the next business day and completed within seven days from the date the current soil disturbance activity ceased. 154 A site map/construction drawing(s) showing the specific location(s), size(s), and length(s) of each erosion and sediment control practice 155 Descriptions of structural practices used to divert flows 156 The dimensions, material specifications, installation details, and operation and maintenance requirements for all erosion and sediment control practices. 157 Calculations for siting and sizing of any temporary sediment basins and/or traps 158 Identification of any maintenance or inspection actions that are required prior to converting practices to permanent control measures 159 A maintenance inspection schedule for the contractor(s) 160 A description of the pollution prevention measures that will be used 164 Description of construction and waste materials expected to be utilized on-site or adjacent to site 165 Description of controls to reduce pollutants from these materials 166 Description of cleanup procedures and spill prevention and notification for each material Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 7 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Ck List-Short C. Erosion and Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 MS4 Clarificatons & Requests MS4 Staff/Others Part III. Content Check List - Short Version C. Erosion and Sediment Control Components Item Preparer Reviewer(s) Erosion and Sediment Control Components if present if NA Item Location (Pg Consultant 167 A description and location of any stormwater discharges associated with industrial activity 168 Identification of any elements of the design that are not in conformance with the design criteria in the technical standard 169 ~include the reason for the deviation or alternative design 170 ~provide information which demonstrates that the deviation or alternative design is equivalent to the standard. 171 If project is in a regulated MS4, description of winter month, October 15 to April 15, requirements related to E&SC (i.e. anchoring mulch material, sediment removal from basins/traps, use of winter rye seed, offset silt fence, etc.). See Winter Shutdown and Site Inspection Requirements available from MS4. 172 TRACKING SPECIFIC DESIGN ELEMENTS: 173 To help track the review of E/SC practices for presence/absence, size, and length information, MS4s may want to call out practices of concern and note comments. Space is provided here for that purpose. 174 E/SC Practice #1 Description of Practice: Location present, Y/N Size present Y/N Length present, Y/N Comments: 176 To help track the review of each E/SC practice for presence/absence of dimension, material specification, installlation details, and operation and maintenance requirements for erosion and control practices MS4s may want to call out specific practices of interest and make comments. Space is provided here for that purpose. Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 8 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Permit Part III. Content Ck List-Short C. Erosion and Sediment Control Components Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP- 0-15-002 MS4 Clarificatons & Requests MS4 Staff/Others Part III. Content Check List - Short Version C. Erosion and Sediment Control Components Item Preparer Reviewer(s) Erosion and Sediment Control Components if present if NA Item Location (Pg Consultant 177 E/SC Practice #1 Description of Items present: Dimensions, Installation details,Y/N__? Operation and maintenance requirements, If temporary sediment basin, location present, Size present, If structural practice to divert flows, location present, Y/N Size present, Y/N Comments: 179 To help track design elements not in conformance with the design criteria in the technical standards, MS4s may want call out specific practices of interest, as follows, and make comments. Space is provided here for that purpose. 180 Non-Conforming Design Element #1 Description: Reason for deviation or alternate design present, Info demonstrating that deviation or alternative design is equivalent to standard present, Comments: Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 9 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests 182 From Construction Activity Permit: 183 Post-construction stormwater management component- 185 The post-construction stormwater management practice component of the shall include the following: 186 Identification of all post-construction stormwater management practices 187 A site map/construction drawing(s) 188 Stormwater Modeling and Analysis Report that includes: 189 ~Map(s) showing pre-development conditions, Watershed/sub-catchment includes any upstream watersheds draining onto the project site and the associated stormwater collection and conveyance structures 190 ~Map(s) showing post-development conditions Watershed/sub-catchment includes any upstream watersheds draining onto the project site and the associated stormwater collection and conveyance structures 191 ~Results of stormwater modeling (i.e. hydrology and hydraulic analysis) 192 ~Summary table, with supporting calculations 193 ~Identification of any sizing criteria that is not required 194 ~Identification of any elements of the design that are not in conformance with the performance criteria 195 Soil testing results and locations (test pits, borings) Testing is conducted in conformance with the NYS Stormwater Management Design Manual (2015) Appendix D. 196 Infiltration results, when required, in particular at location of stormwater management practices. 197 From Construction Activity Permit: 198 If Enhanced Phosphorus Removal Watershed(s): (NA for Albany County) MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 10 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 200 Chapter 3 Stormwater Management Planning Requirements (Five Step Process) MS4 Requests & Clarifications 201 Planners and designers must address this approach (i.e. stormwater management planning) in a step-wise process that involves site planning and stormwater management practice (SMP) selection. This includes providing information in the which documents compliance with the required process. The steps include: 202 The Six Step Process for Stormwater Site Planning and Practice Selection 203 Step 1 Site Planning 204 Text or chart which describes how Preservation of Natural Resources practices have been incorporated into the Stormwater Management Plan. 213 Text or chart which describes how Reduction of Impervious Cover practices have been incorporated into the Stormwater Management Plan. 222 The must include an evaluation of all green infrastructure planning measures as they apply to the site. The evaluation process requires the following measures: 223 1. Developing a map that identifies natural resource areas and drainage patterns, including, but not limited to: 224 ~Wetlands (jurisdictional, wetland of special concern) 226 ~Waterways (major, perennial, intermittent, springs) 227 ~Buffers (stream, wetlands, forest, etc.) 228 ~Floodplains ~Map includes100-yr floodplain and floodway limits if disturbance proposed is in the floodplain 229 ~Forest, vegetative cover ~Map includes description and boundaries of the existing predominant vegetative cover on the project site Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 11 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 230 ~Critical areas ~Map includes location and boundaries of resource protection areas (water supply well setbacks, septic system setbacks, sole source aquifers, etc.) 231 ~Topography (contour lines, existing flow paths, steep slopes, etc.) ~Map includes existing topography a minimum of 50’ beyond the property (min. 2’contours), or as required by MS4 232 ~Soil (hydrological groups, highly erodible soils, etc.) ~Map includes description and map of all soils on the site ( HSG, highly erodible soils, E and F Soil Slope Phase, others) 233 ~Bedrock, significant geological features ~Map notes location of karst bedrock, if any 234 ~If project near Hudson River, map notes location of sea-level rise projections along Hudson for 2020, 2050, and 2080 ClimAID Supplement Risk Information September, 2014 (Rule making pending-Community Risk and Resiliency Act) 235 2. Devising the strategies for protection and enhancement of natural resources 240 3. Reduce the impacts of development by reducing impervious surfaces 241 4. Demonstrating that all reasonable opportunities for preserving natural conditions of the site are employed 242 During the planning step, the designer should check with municipalities to determine if there are local laws and ordinances that regulate wetlands, stream buffers, forest or habitat protection, erosion control or grading. The designer should also consult the municipalilty for laws relating to conservation or cluster design, roads, driveways, and parking lots to determine level of flexibility in reducing impervious surfaces. acknowledges and complies with applicable local laws . Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 12 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 243 Step 2 Determine Water Quality Treatment Volume (WQv) 244 The designer calculates the required WQv for the site using criteria in Chapter 4. Once the preliminary site layout is prepared: 245 ~impervious areas are defined calculates impervious area using Design Manual Chapter 4 definition. Total area, impervious area, % impervious calculated for each sub-catchment. % impervious used in WQv calculations. 246 ~sub-catchments are delineated text and related maps identify the sub-catchments used to calculate water quality volume (WQv). 247 ~designer calculates the water quality volume Water quality volume calculations matched to sub-catchment and impervious areas. Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 13 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 248 Step 3 Apply Runoff Reduction Techniques and Standards SMPs with RRv Capacity (e.g. infiltration practices, bioretention, open channel practices) to Reduce Total WQv 249 includes a thorough and clear analysis of: 250 1) how the require total WQv was calculated; 251 2) description and calculation of minimum runoff reduction requirement; 252 3) description of runoff reduction calculations for each of the techniques listed in Table 3.2 and SWPs with RRV capacity; 253 4) reason why a particular runoff reduction technique or techniques were selected by the designer; 254 5) reasons why a particular runoff reduction technique was not selected; and 255 6) for redevelopment projects use of any runoff reduction techniques, if any 271 If the standard SMPs with RRv capacity listed above are used to address RRv criteria, the practices must be designed to capture runoff at the source. text describes location of any standard SMPs with RRv capacity included in the and provides an estimated distance from source of runoff to SMP showing that practice captures runoff at source. 272 text states clearly based on calculated values documented in the (runoff reduction worksheets) that the RRv value is greater than or equal to WQv value. 273 If runoff reduction volume can not be met, states clearly specific site limitations related to all possible runoff reduction techniques. Explanation references data from soil borings, test pits, and infiltration tests. Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 14 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 274 If designer can not reduce 100% of the WQv due to site limitations, the states which runoff reduction techniques or standard SMP with RRv capacity will be used unless infeasible. 275 Step 4 Determine the minimum RRv required 276 text describes how the minimum RRv was calculated. 277 Step 5 Apply Standard Stormwater Management Practices to Address Remaining Water Quality Volume 278 text describes how much of the water quality volume will be treated using runoff reduction techniques or SMPs with RRv capacity and describes which standard SMPs will be used to treat the remaining WQv. Text verifies that RRv requirement has been met. 279 Step 6 Apply Volume and Peak Rate Control Practices if Still Needed to Meet Requirements 280 text describes which channel protection; overbank flood control, and extreme flood controls will be used to meet water quantity requirements, as needed. 281 Criteria for Practice Addition 282 text, as needed describes alternate stormwater management practices in new construction. Description includes all relevant explanations regarding equivalency, required performance and sizing criteria, and requirements related to proprietory practices. Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 15 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 286 Exceptions to Meeting the Runoff Reduction Volume (RRV) Criteria: 287 If project is a redevelopment activity, text explains Chapter 9 criteria and status of this project for meeting RRv criteria. 288 If project is located in area with karst geology, text explains results of recommended geotechnical assessment, the need to avoid large infiltration basins; and explains why and which runoff reduction techniques are included in the 289 If project activity will result in or include any of the NYSDEC stormwater hotspots, the describes which non-infiltration type practices will be used to meet the RRv criteria. 290 Chapter 9 Redevelopment Activity NYSDEC Stormwater Management Design Manual-2015 MS4 Requests & Clarifications 291 Determinations regarding waiver of water quantity requirements: 292 10- and 100-year water quantity control criteria waived … Calculations indicating no alteration of hydrology that would increase discharge rate (ref. Results of stormwater modeling, Ck List Item No.188. 293 Channel protection water quantity control criteria waived because no change in hydrology…. Calculations showing that the post- construction 1-yr 24-hour discharge rate and velocity will not exceed the pre-construction condition (ref. Results of Stormwater Modeling: Ck List Item No. 188) Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 16 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 294 Treatment is required for 100% of runoff from newly created impervious surfaces and 25% of redeveloped (pre-existing) impervious surfaces Calculation of the water quality volume with separate components for new impervious surfaces and reconstructed impervious surfaces (ref. Step 2, Determine Water Quality Treatment Volume: Ck List Item No. 188) 295 Option selected for meeting the water quality criteria for redeveloped portions of site (or all of site if no increase in impervious): 296 __Impervious cover at close of construction reduced by at least 25% of the total disturbed impervious area, with soil restoration in newly created pervious areas Site plans clearly indicate areas converted from impervious to pervious conditions and text/narrative shows acreages or square footage reduced 297 minimum of 25% of the WQv from the disturbed impervious area is captured and treated by standard practices or reduced by runoff reduction techniques. Site plans show location of standard or runoff reduction practices and indicate the contributing drainage areas to them. 298 __Alternative ("proprietary") practices will treat 75% of the WQv from the disturbed impervious area as well as any additional runoff from tributary areas outside the disturbed impervious area. Site plans show location of proprietary practices and drainage areas to them, and list the manufacturer and model for validation that the technology is accepted by NYSDEC. 299 combination of the above three approaches is proposed and weighted using the following formula: %WQv treatment by Altnerative practice = (25 - (%IC reduction + WQv treatment by Standard practice + % Runoff reduction)) x 3 If this formula is used to determine the proportion of the WQv that must be handled by alternative practice, inputs to the calculation should be provided with supporting data. Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 17 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content CkList Short D. Post Construction Stormwater Mgmt Componants Project: Required Content Additional Content if present if NA if present if NA Text from Construction Activity Permit GP-0-15-002 or NYS Stormwater Management Design Manual (2015) Chapters 3 & 9 MS4 Clarifications & Requests MS4 Staff/Others Part III. Content Check List - Short Version D. Post Construction Stormwater Management Components Item Preparer Reviewer(s) Post Construction Stormwater Management if present if NA Item Location (Pg Consultant 300 From Construction Activity Permit: 302 Chapter 3 Stormwater Management Planning (Operations & Maintenance Plan) 303 Operations and maintenance plan, which... 312 TRACKING SPECIFIC DESIGN ELEMENTS: 313 To help track the review of post construction stormwater management practices for require elements, reviewers may want to call out practices of concern and note comments. Space is provided here for that purpose. 314 Post Construction Practice #1 Description of Practice: Sizing criteria met, Performance criteria met, Required elements present,Y/N?___ 316 To help track design elements not in conformance with the design criteria in the technical standards, MS4s may want call out specific practices of interest, as follows, and make comments. Space is provided here for that purpose. 317 Non-Conforming Design Element #1 Description: Reason for deviation or alternate design present, Info demonstrating that deviation or alternative design is equivalent to standard present, Comments: Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 18 of 19 ---PAGE BREAK--- MS4 Oversight of Construction Activity Permit Part III. Content Ck List-Short Version E. Municipal/MS4 Requirements Municipal Requirements Drawings, Maps, Specifications, Standards if present if NA if present if NA Requested by MS4s 319 Map requirements (can be incorporated into other maps) 320 ~project boundary, 321 ~adjacent parcels, 322 ~streets 323 ~adjacent municipalities 324 ~adjacent MS4s of all types 325 Standardization: 326 For stormwater practices which require sizing: Use standard Town of Colonie rainfall amounts for the 1, 2, 10, 25, 50, 100-year 24-hour and 90% rainfall events. They are 1-yr = 2.5”, 2-yr = 2.8”, 10-yr = 4.5”, 25-yr = 5.0”; 50-yr = 5.8”; 100-yr = 7.0”, and 90% rainfall = 1.2”. 328 Use of City-Town-Village-County-University Standard Specifications (if any) for design of the storm drain system (i.e. catch basins, manholes, piping, etc.) 329 Construction Drawings 330 Stamped construction drawings and with the signature and seal of a ‘Qualified Professional as defined in GP-0-15-002 Construction Activity Permit. 331 Location of existing and proposed roadways, lot boundaries, buildings, and other structures 332 Location of existing and proposed utilities (e.g. water, sewer (sanitary and storm), gas, electric) and easements 333 Location of existing and proposed conveyance systems (i.e. swales, MHs, CBs, pipes, etc.) 334 Existing and proposed elevations for storm drain structures (i.e. pipes, CBs, manholes, etc.). Include vertical separation distances for all utilities. 335 Flow paths of surface and subsurface stormwater management structures (use flow arrows) 336 Locations and dimensions of all proposed channel modifications (i.e. bridges & culverts) 337 Final landscaping plans - include buffer zones, reforestation, or wetland mitigation areas 338 Location of sea-level rise projections along Hudson for 2020, 2050, and 2080 ClimAID Supplement Risk Information September, 2014 Part III. Content Check List - Short Version E. Municipal Requirements for Drawings, Maps, and Specifications Pertaining to Stormwater Management Item Preparer Reviewer(s) if present if NA Item Location (Pg Consultant MS4 Staff/Others Stormwater Coalition of Albany County Guidance Document Part III CkList Short: 19 of 19